Scale defines the relationship between distances on your plan and actual distances in the real world. Without correct scale, all measurements and area calculations will be wrong. Each page in a project maintains its own scale setting.
Automatic scale detection
Exayard attempts to detect scale automatically during upload by reading scale notations, title blocks, and scale bars on the drawing. When detection succeeds, the scale appears on the scale button beside the sheet's name in the project's bar. Click it, or press S, to open the scale box on Scale in use and a word on where it came from, such as Printed on the sheet or Set by you. More at the foot of the box says it in full, such as Read from the scale printed on the sheet or Worked out from the drawing. This sheet prints no scale. When Exayard checked the scale against dimensions printed on the sheet, More says so too, for example Matches 4 of 5 dimensions measured on the drawing. Click Show the dimensions we read to see them.
A sheet's scale reads No scale when it has none, and Check scale when it may be wrong, such as when the dimensions on the sheet disagree with it. Then the box offers the scale the dimensions suggest, such as Use 1/8" = 1', and More says by how much they disagree. Known distance in the box starts the flow described below.
Setting scale from presets
Click the scale button (it reads No scale if no scale is set, or the current scale) or press S. Under Pick the printed scale, choose the Imperial or Metric tab and browse common presets organized by type:
Architectural scales (Imperial): 1/4" = 1', 1/8" = 1', 3/16" = 1', and more
Engineering scales (Imperial): 1" = 10', 1" = 20', 1" = 50', up to 1" = 100'
Metric scales: 1:50, 1:100, 1:200, 1:500, up to 1:10000
Click a preset to apply it. The box stays open on the new scale. To remove the scale, open More and click Clear scale.
Custom scale entry
For non-standard scales, use the custom entry fields under the presets. On the Imperial tab, enter drawing inches and real-world feet (for example, 1 inches = 25 feet). On the Metric tab, enter the Ratio as two numbers (for example, 1:150). The scale saves automatically as you type.
Using another sheet's scale
On a sheet with no scale, the box offers Same scale as another sheet, listing scales already set on other sheets of the set. Click one to put it on this sheet. Once a sheet has a scale, one row such as Use on 3 other sheets offers it to the other sheets that print the same scale or none: click Apply. Lengths and areas on those sheets are measured again at the new scale. When no other sheet can take the scale, More says so and lists the sheets left out.
Drawing a known distance
The most accurate calibration method uses a known dimension from your plan. Open the scale box and click Known distance, the row under the picker, or press D on the sheet.
A prompt appears reading "Click and drag to draw a reference line" (on a touch screen, "Touch and drag"). Press at the start of a marked dimension, drag to its end, and release.
A dialog titled Known distance asks for the real length of the line you drew. Type it in This line is and pick ft or m. The dialog shows the scale it gives, such as Scale 1/4" = 1'. Click Set scale to apply it.
For best results, use the longest clearly-marked dimension available. Zoom in closely before drawing to minimize placement error. The reference line stays on the page after calibration. To remove it, open the scale box, open More, and click Clear reference line.
Details at their own scale
A sheet can print a plan at one scale and a detail at another. In the scale box, open More and click Set a scale for part of this sheet, draw a box around the detail, then pick the detail's scale. Lengths and areas drawn inside the box use its scale. More lists these under Detail viewports on this sheet, with Remove beside each one you drew.
Image sheets
A sheet uploaded as an image file (JPEG, PNG, or another image format) carries no page size. A printed ratio such as 1/4" = 1' can only be guessed on it, so the scale box leads with a known distance instead. It opens with the note "This sheet is an image, so its size is not known." Click Known distance to calibrate from a dimension on the plan.
The Imperial and Metric tabs, their presets, and the custom entry fields stay hidden at first. Click Use a printed ratio anyway to show them. If you already chose a printed ratio on that sheet, they stay open.
Satellite imagery
When you capture aerial imagery through the Aerial survey feature, scale is calculated automatically based on the map's zoom level and geographic location. No manual calibration is needed. See Uploading PDFs and images for supported file types and upload details.
Verifying accuracy
After setting scale, measure a known dimension that you did not use for calibration. If your measurement closely matches the printed value, the scale is accurate. If it differs significantly, recalibrate using a different reference dimension.
Per-page scale
Different pages often have different scales. Site plans commonly use engineering scales (1" = 20') while floor plans use architectural scales (1/4" = 1'). Always verify scale on each page before measuring.
Common issues
If measurements seem too large or small, the scale is likely incorrect. Recalibrate using a known dimension. For plans scanned at non-standard resolutions, trust your calibration against known dimensions rather than graphic scale bars. Always calibrate before measuring to avoid redoing work.
