A project in Exayard holds your construction plans, measurements, and reports in one place. Create a project and add your drawings.
Upload your drawings and Exayard measures them for you: every drawn area, run and symbol, with no measuring by hand. Each line of the estimate is priced from your own prices when you have them, otherwise from the published price book or local market prices for your area, and each line shows which. Your own prices are optional; they make the estimate closer.
Creating a project
On the home screen, click New project (+) beside Projects in the side panel to open the New project dialog. Enter a name in the Project name field. Names like "Smith Residence (Landscaping)" or "Bid #2024-156 (HVAC Install)" make it easy to find projects as your list grows. Leave it blank and Exayard names the project from your plans. Click Create and you are taken directly into your new project workspace.
You can rename a project at any time. Click the project's name at the start of the project's bar and choose Project settings to change the name.
Adding files
A new project opens on one drop zone: Drop your sheets here. Drop your plan files on it, or click Upload sheets. For other ways to add files, click New on the project's bar.
File upload opens a file picker for selecting PDFs, images, or CAD drawings from your computer. Multi-page PDFs are split into individual pages automatically, and each page becomes a separate sheet you can navigate and measure independently. JPEG, PNG, and TIFF images and DWG, DXF, and DGN CAD files are also accepted.
Folder upload preserves your folder structure inside the project. Select a folder and Exayard recreates the hierarchy, keeping related plans organized together.
New document creates a blank document inside the project that you can edit directly.
Aerial survey opens a satellite map view. Search for an address or navigate to your project location, then capture the current view. The captured image includes GPS-calibrated scale, so you can start measuring outdoor areas immediately without manual scale setup.
While files process, their progress shows at the foot of the sheet list. Multi-page PDFs and large folders may take a moment to finish.
Setting the scale
Open a sheet and click its scale button, beside the sheet's name in the project's bar, or press S. The button reads No scale until a scale is set. If Exayard detected a scale notation on your plan, it appears automatically. On a PDF sheet, the scale box opens with preset scales under the Imperial and Metric tabs. Choose one, or enter a custom scale below them: drawing inches to real feet under Imperial, or an X:Y ratio under Metric.
When you have a known dimension on the plan but no scale notation, click Known distance in the same box, or press D. Drag along a dimension whose length you know, enter the real-world distance, and Exayard calculates the correct scale.
A sheet uploaded as an image file has no page size, so a printed ratio can only be guessed there. On an image sheet, the scale box opens with a warning and leads with Known distance. The Imperial and Metric presets appear only after you click Use a printed ratio anyway.
Each page can have its own scale. Verify the scale when switching between pages, especially if your plan set includes sheets at different scales.
Organizing with folders
Folders live on the files side of the sheet list. Open View options at the top of the sheet list and set Group by to File to see them. There, click New and select New folder, then enter a name like "Floor Plans" or "Electrical Details". Drag files into folders to organize them.
To switch the list to tiles with thumbnails, set Display to Grid in the same View options menu. Set it to List to switch back.
Next steps
With your files uploaded, click Start takeoff at the end of the progress line under the item list's header, or ask Exa in the chat to start the takeoff. See AI takeoffs for how it measures your sheets, and understanding the interface for the workspace layout and measurement tools.