Skip to main content

Profile settings

Update your profile information and preferences.

Written by Sarah Chen

Your profile settings control how you appear to other team members and how you access Exayard. These settings are personal to your account and apply across all organizations you belong to.

Accessing your profile

Click your picture at the foot of the column of icons on the left edge of the screen and select Settings from the menu. The settings sidebar shows your personal settings at the top (General, Security, Notifications, Referrals) with organization settings below. Your profile is the first section of General, above the theme and language.

Profile information

Your profile displays information that helps teammates identify you. You can update your profile photo by clicking your current avatar and uploading a new image. Your display name and email address can also be edited here, and your job title, which is shown on the bids you send. Changing your email requires verifying the new address.

Connected accounts

Link external accounts for faster sign-in. Exayard supports the social sign-in providers configured for your instance, such as Google. Click a provider name and follow the authentication flow to connect it. Once linked, you can use that account as an alternative way to sign in.

Appearance and language

Under Appearance, Theme sets how the app looks on this device: System, Light or Dark. Language sets the language used for menus and emails.

Security settings

Click Security in the settings sidebar to manage your password, sign-in methods and devices.

To change your password, click the password section and enter your current password for verification, then set your new password. Follow the strength requirements shown in the form.

Two-factor authentication adds an extra layer of protection. Enable it by scanning a QR code with an authenticator app like Google Authenticator or Authy. Once configured, you will need both your password and a code from the app to sign in. Save the backup codes you receive in a secure location since they are the only way to recover your account if you lose access to your authenticator app.

The Active devices section shows devices where you are currently signed in. It lists this device and a few others; click Show all to see the rest. Sign out of any device you do not recognize to protect your account.

Deleting your account

At the bottom of Security, Delete account removes your account and signs you out. Click it, then confirm with Delete account. This cannot be undone.

Did this answer your question?