Construction takeoff & estimating

Run construction takeoffs and estimates from Claude

Connect Exayard to Claude with a single MCP link. Once it's added as a connector, Claude can run takeoffs, pull live vendor pricing, and draft bids across your construction projects — just by asking in plain English.

What is Claude?

Claude is Anthropic's AI assistant, available in the Claude desktop app and at claude.ai. Add the Exayard MCP server as a custom connector and Claude can do real estimating work — measuring plans, pricing materials, and drafting bids — without you leaving the chat.

Built for autonomous estimating

Exayard exposes every takeoff, pricing, and bid action as a tool Claude can call, so it does the work you would normally click through by hand.

Estimate in plain English

Describe the outcome and Claude drives Exayard for you — no clicking through screens, no glue code.

Real catalog and vendor pricing

Claude searches your product catalog and live vendor prices, so every estimate is built on real numbers.

Takeoff to bid in one request

Chain detection, approval, estimating, and bid generation into a single turn instead of an afternoon of work.

What you can do with Claude

Once Claude is connected, you can drive Exayard with plain-language prompts.

Browse projects, files, and pages
Run AI takeoffs on your plans
Search the product catalog and vendor prices
Generate cost estimates and bid documents
Subscribe to project lifecycle webhooks
Answer questions grounded in uploaded plans

Install in 60 seconds

Four short steps to wire Claude to your Exayard projects.

1

Open your Claude config

On macOS, open ~/Library/Application Support/Claude/claude_desktop_config.json. On Windows, open %APPDATA%/Claude/claude_desktop_config.json. For claude.ai, go to Settings → Connectors → Add custom connector.

2

Add the Exayard MCP server

Paste the snippet below into your config (or use the URL directly in the claude.ai custom connector form).

{
  "mcpServers": {
    "exayard": {
      "command": "npx",
      "args": ["mcp-remote", "https://api.exayard.com/mcp"]
    }
  }
}
3

Restart Claude and authorize

Restart Claude Desktop (or refresh claude.ai). On first use, Claude will open the OAuth consent screen — sign in with your Exayard account and approve the scopes Claude requests.

4

Try a prompt

Click the tools icon in Claude to confirm Exayard tools are listed, then try one of the example prompts below.

See Claude in action

Watch a quick walkthrough of connecting and using Claude with Exayard.

Example prompts

Drop any of these into Claude after connecting.

You

Create a project named "Maple Heights renovation" and upload my plan PDFs.

You

Run a takeoff on page 3 of the Smith Residence plans and show me the proposed receptacle count.

You

Generate a bid from the approved Smith Residence takeoff, with a 15% markup.

You

Search the product catalog for 12-gauge copper wire and show me the cheapest vendor.

You

Compare estimated cost vs. last quarter for projects tagged "kitchen remodel".

Built-in workflows

Exayard ships MCP slash-commands so Claude can run end-to-end workflows in a single turn.

/takeoff_from_plans

Run a takeoff end-to-end on uploaded plans.

/generate_bid_from_takeoff

Price an approved takeoff and emit a bid document.

/review_estimate_line_items

Audit an existing estimate for outliers and missing prices.

/create_project_from_upload

Scaffold a project and attach files from a chat upload.

Browse the full tool catalog

Keep a human in the loop

Destructive tools (archive, remove, cancel, approve) are gated behind a propose_destructive_action step that surfaces in Claude and waits for your explicit confirmation before running.

Long-running calls like create_estimate and create_bid take 30–60 seconds — Claude will warn you before invoking them.

Frequently asked questions

Works with your whole agent stack

Exayard speaks MCP, so it drops into every major AI agent and editor.

Ready to win more bids?

Use Exayard to estimate faster and win more work. Get started today.