Uploading files is how you get construction plans into Exayard for measurement. The platform accepts PDFs, common image formats, CAD drawings, and zips of them, processes them in the background, and makes them available for takeoffs.
Supported formats
Exayard accepts PDF documents, image files (JPEG, PNG, TIFF, HEIC, GIF, WebP), and CAD drawings (DWG, DXF, DGN). Individual files can be up to 500 MB. Multi-page PDFs are split automatically into individual pages, each appearing as a separate sheet in your project. A multi-sheet CAD file is split into one page per sheet when the drawing allows it, using its layouts or sheet frames that can be told apart. High-resolution PDF scans at 200-300 DPI work best for accurate measurements and AI-assisted scale detection.
Other CAD and design formats, such as DWF, DWFx, RVT or SKP, are not turned into sheets. A file in one of those formats shows Not read on its row, with the formats that work and Choose another file. Export it to PDF, DWG, DXF or DGN from the program that made it, then upload that file.
Zip files
Drop a zip (or RAR) of drawings on the project page, or pick it with Upload sheets or File upload, to upload it. Exayard looks inside, and Needs you at the foot of the item list shows anyone who can edit the project a line such as "plans.zip has files inside to extract". Click Extract to add the files inside to the project in the zip's own folders, each read like a normal upload. With several zips, each has its own line and its own Extract. A zip with more than 2,000 files cannot be extracted, so split a larger set into smaller zips, and a zipped PlanSwift job is offered as an import instead (Import from PlanSwift).
Upload methods
In a new project, drop your files on the page or click Upload sheets. Any time after that, click New on the project's bar to see upload options. File upload opens a file picker where you can select one or more files. Folder upload preserves directory structure, recreating your folder hierarchy inside the project. New document creates a blank document inside the project that you can edit directly.
You can also email your drawings to Exa at exa@mail.exayard.com, sent from the address on your Exayard account. Exa adds them to a new project and starts a takeoff. See Email Exa.
One upload can hold at least 250 pages. If a file has more pages than one upload allows, Exayard does not read it and tells you the limit. Split the file into smaller files and upload them in parts.
Aerial survey captures satellite imagery directly. Search for an address or navigate manually, adjust the zoom level, and capture the view. Choose between satellite, hybrid, or map display before capturing. The image includes GPS-calibrated scale for immediate measurement without manual calibration.
File processing
Uploaded files go through several processing stages. First the file uploads to Exayard's servers, then multi-page PDFs split into individual pages, and finally the AI analyzes each page for scale notations and measurable elements.
While files upload, each one's progress shows at the foot of the sheet list, where its new sheets fill in. On a phone, a line on the sheet's bar says how many are uploaded, such as 2 of 3 uploaded: tap it to open the list. Once complete, the sheets are in the list ready for measurement. Large, high-resolution files may take a few moments to process fully. CAD files (DWG, DXF, DGN) take longer than PDFs to process, typically 30-60 seconds for a single-sheet drawing.
Uploading the same file again
If you upload a file that is already in the project, nothing is added and nothing is read or charged again. Its row in the upload progress says Already in this project. Click the row to open the file that is already there.
Organizing files
Create folders to keep projects manageable. Click New, then select New folder and enter a name. Open the menu on any file or folder for Rename, Move to, and Delete. Deleted items move to Deleted rather than being permanently erased, so you can recover files if needed. See Folder organization and File operations.
Tips for best results
Upload scans at 200-300 DPI for optimal AI detection and clear manual measurements. Include scale bars or written scale notations when possible so Exayard can detect scale automatically. Use descriptive file names like "Sheet E-101 Electrical Plan.pdf" rather than "scan001.pdf" to make files easier to find.
If a PDF does not split into pages, check whether it is password-protected or encrypted. Exayard cannot process protected documents. Re-save the PDF without protection from your original software and try uploading again.
If a sheet says Not read with Try again, the read failed on Exayard's side, not because of your file. It is not a password, the file size or your plan. Try again reads the sheet once more. You do not need to upload the file again.
If a CAD file comes in as one page with a Many drawings on one sheet warning, the file placed many drawings side by side in one space, so each drawing is small and automatic takeoff on that page may miss items. Export each sheet from your CAD program as its own PDF page or plotted layout, then upload again.
