Skip to main content

Uploading PDFs and images

Detailed guide on uploading and processing construction documents.

Written by Sarah Chen

Files are the foundation of every takeoff. Exayard supports PDFs, common image formats including JPEG, PNG, TIFF, and HEIC, and CAD drawings in DWG, DXF, and DGN format. Multi-page PDFs are automatically split into individual pages for easier navigation and measurement. The maximum file size is 500 MB per file. One upload can hold at least 250 pages; split a larger file into smaller files and upload them in parts. See Uploading files.

How to upload

Click New on the project's bar and select File upload to browse for files on your computer. In a new project, you can also drop files on the page or click Upload sheets. You can upload multiple files at once, and they appear in your current folder location.

To upload an entire folder while preserving its structure, click New and select Folder upload. Exayard creates the folder hierarchy automatically and places all files in the correct locations. System files like .DS_Store and Thumbs.db are filtered out automatically.

Upload progress

While files upload, each file's row shows its progress at the foot of the sheet list, and its sheets fill in above it as they are made. A row says Uploaded once its file is in, or Already in this project when the same file was uploaded before. See Uploading files. You can continue working while uploads finish.

Large PDFs with many pages may take several minutes to process. CAD files typically take an additional 30-60 seconds before pages are extracted. You can move to other parts of the project while waiting.

Aerial survey capture

For site plans and outdoor projects, click New and select Aerial survey. Search for an address or navigate the map, then adjust the zoom level and choose a map type: Satellite, Hybrid, or Map. Click Capture to add the imagery as a new page.

The scale is automatically calibrated based on the map's zoom level and geographic coordinates. This automatic calibration accounts for the map projection and provides accurate measurements without manual setup. For more on adjusting scale after capture, see Scale calibration.

File formats and conversion

HEIC and TIFF images are converted to JPEG for web viewing while the original file is preserved. When you download these files, you can choose between the original format or the converted JPEG.

CAD files (DWG, DXF, DGN) preserve fonts, hatches, lineweights, and layout when imported. The original CAD file is retained so you can download it later if needed.

Vector PDFs typically provide sharper results than scanned documents. If you are working with scanned plans, 200-300 DPI provides the best balance of quality and file size. Lower resolutions may appear blurry and affect measurement accuracy.

Tips for organizing uploads

Navigate to your destination folder before uploading so files land in the right place. Use Folder upload when your plans are already organized on your computer. Combine related sheets into a single multi-page PDF when possible, as this keeps plans organized and easier to navigate.

Use descriptive filenames before uploading since these become the default page names in Exayard. You can rename pages after upload, but starting with good names saves time.

Related articles

Did this answer your question?