Skip to main content

Count measurements

Count items like fixtures, plants, outlets, and other countable elements.

Written by Sarah Chen

Exa counts every symbol on a sheet for you with an AI takeoff. Use the Count tool for the few you want to add or fix by hand. Count measurements track quantities of individual items like plants, fixtures, irrigation heads, and light fixtures. Each click adds one to your total count.

Starting a count measurement

With no count item picked, click Count on the tool bar at the foot of the sheet, or press E. A new item opens in the item list, where you can name the symbol, choose a marker color, and set the dot appearance. Click Start to begin counting. With a count item picked, Count adds more of that item.

Placing count markers

Once in counting mode, click on each item you want to count. A colored marker appears at each location, and the item's total beside the pointer and in the item list counts each one as you place it. Continue clicking until all items are counted, then press Escape or select another tool to exit.

Marker appearance

On a new count item, open the Color picker on its card to customize count markers. On the open item, Color… in its menu sets its color and opacity, and Look… sets its Dot style and Dot size. Each new count item starts with the next dot style, so two items side by side look different. Pick one of three dot styles (circle, square, or triangle) and adjust Dot size from 3 to 20 pixels. Different styles help distinguish symbol types when they overlap on the canvas.

Dimensional properties

Count symbols can include physical dimensions for material calculations. Set Diameter for circular items like plants, or use Length and Width for rectangular items. These are mutually exclusive: setting length and width disables diameter, and setting diameter disables length and width.

The Height, depth or pitch row adds a Drop and a Depth for volume. The drop is the vertical length each counted item adds, which a plan view does not show. Exa offers the sizes printed on the sheet under Printed on the sheet, and the chat can set them for you. These dimensions flow into estimates for accurate material ordering.

Managing markers

To remove individual markers while you count, click Remove marks on the small bar above the tool bar. Click on any marker to delete it and decrease the count.

To remove multiple markers at once, click Cut out (X) under More tools with nothing picked. Click one corner of a box around the markers, then the opposite corner, and every marker inside the box is deleted. The box also cuts any areas and lines it covers, as Drawing tools explains.

Merging symbols

To combine count symbols, open one's menu, on its row or the open item, choose Merge with…, then choose the item to merge into it. The likeliest ones come first. To merge from the sheet, pick marks of several items and choose Merge these 2 items in the More (⋯) menu of the bar at the foot of the item list. The merged item keeps all their markers.

Visibility controls

Open a count symbol's menu, on its row or the open item, and choose Hide on sheet. Hidden symbols remain in your takeoff but do not display on the sheet. Choose Show on sheet to bring them back. Turn on Hide marks on hover under Display in the sheet's menu, opened from the sheet's name in the project's bar, to hide the measurement under your cursor, making it easier to see the plan beneath it.

Keyboard shortcuts

Action

Shortcut

Select Count tool

E

Cancel counting

Escape

Decrease dot size

[

Increase dot size

]

Remove last placed point

Backspace or Delete

Delete selected

Delete or Backspace

Add or remove a mark from the selection

Shift + Click

Undo

Ctrl/Cmd + Z

Redo

Ctrl/Cmd + Shift + Z

Tips

Use descriptive names including size specifications like "15-gallon Olive Tree" rather than just "Tree." Set diameter or dimensions on plant symbols for nursery orders. Create separate symbols for different sizes or types even if they look similar on plans.

Did this answer your question?