A project opens on a sheet, the way a PDF opens on its first page. A column of icons runs down the left edge of the app. Inside the project, the chat, the sheet list, and the item list sit beside the open sheet. The chat and the sheet list fold away when you need the room. In a window 1024 pixels wide or wider, the item list always shows. Understanding this layout helps you work efficiently from your first project.
The left edge
The column of icons on the left edge is the same on every screen. Home and Search sit at the top, followed by Knowledge and Templates. At the foot, Help sits above your picture, which opens the Account menu.
Help opens the Help center, Chat with us, the Quick tour video, and Shortcuts. The Account menu switches companies and holds the theme, your language, Settings, Usage, Invite teammates, Developer, and Sign out.
Side panels
The chat on the left and the sheet list beside it work the same way. Each has its own button in the project's bar, always in the same place: Chat (J) and the open sheet's place in the set (Shift+L). Point at the second one to see its name, Sheet list. Click the button or press its key to open the panel beside the sheet, and again to fold it away. In a window 1024 pixels wide or wider, the item list stays on the right of the sheet, with no button to fold it. In a narrower window, Items or L shows and hides it. Drag the divider beside a panel to resize it.
Press \ to fold the chat and the sheet list at once and give the sheet more room. Press it again to bring back the panels it folded. On a window narrower than 1600 pixels, opening the chat folds the sheet list.
Chat
The chat opens from Chat, the Exayard logo at the start of the project's bar. Click it or press J to open the chat beside the project, and again to fold it. While the chat is folded, a dot on the logo tells you Exa has replied.
The chat has two tabs: Exa and Team. Ask Exa about your plans or get help with the platform in Exa, and message teammates in Team. Messages can be pinned to a spot on your plans. Click a pinned message to jump to that spot on the sheet. Click New chat in the chat's header to start a fresh conversation with Exa, or Past chats to open an earlier one.
The project's bar
One bar across the top holds the project and its open sheet. It starts with Chat, then the project's name. The open sheet's part comes next: its arrows, its place in the set, its name, and its controls. At the right sit the people viewing the project, Bids, Share, and New. Bids (Alt+3) opens the project's bids over the sheet, and Reports (Alt+2), the last button in the item list's header, opens your quantities. Press either again, or Alt+1, to go back to the sheet. While Bids is open, a back arrow and the word Bids follow the project's name where the sheet's part was, and the arrow goes back to the sheet too. Where the bar has room, each button shows its key. Short of room, Bids, Share, and New fold to icons, and their names show when you point at them.
Click the project's name to open its menu: Project settings, Pin project, Archive, Move to another organization, and Delete project, depending on your access.
The sheet list
The sheet list holds every sheet in the project, in the set's order. Open it with the sheet's place in the set in the project's bar, or press Shift+L. Press G to open it with the cursor in its find box. Click a sheet to open it. See The project page for what the list holds.
The open sheet in the bar
The open sheet's part of the bar reads like a browser's. The arrows go to the previous and next sheet in the set's order, as Page Up and Page Down do. After them, a figure such as 3/9, or 3 of 9 on a wide window, shows where the sheet sits in the set; click it to open the sheet list. Next comes the sheet's name. Point at it to see which sheets call it, and click it to open the sheet's menu.
Then comes the scale button, which reads the sheet's scale or No scale (see Scale calibration). Once a takeoff is finished, a sheet with its marks shows Mark sheet checked (Shift+C); press it once you have looked the sheet over. The button then reads Checked, and its menu holds Mark not checked. To go back to the sheet you had open before, press Alt+Left (Cmd+[ on a Mac), or your browser's Back.
At the start of the sheet's bar, a cloud shows whether your marks are saved: Saving while a change is on its way, then Saved. With no connection, a crossed-out cloud and a number say how many changes are kept on this device; they are saved once the connection is back. If a save fails, the sign reads Not saved: click it to try again.
The sheet's menu, opened from its name, holds Download, the sheet's versions when it has more than one, Print or download sheets, History, and Display. History opens one panel with the sheet's and the takeoff's history (see Version history). Display holds the sheet's view settings, such as units, grid, and how strongly marks show. For people who can edit, the menu also has Rotate left and Rotate right after Display, which turn the sheet a quarter turn. Below them sit Pin, Rename…, Duplicate, Upload new version…, and Delete, for people who can edit the project. The sheet list's menu for the open sheet is the same menu.
The tool bar
The tool bar floats at the foot of the sheet and stays the same whatever you do. While you draw, a small bar rises above it with the item you are drawing into, the tool's options, Finish mark, and Done (Esc). Point at any button to see its name, its key, and one line of help in its tip. Whatever you pick has its actions on the bar at the foot of the item list.
When a side panel floats over the sheet, both bars move clear of it so every button stays in reach. Where room is short, the bars fold their last buttons into More, and each folded button keeps its key. Each bar is one stop for Tab, and the arrow keys move along it. See Drawing tools for every tool and action.
The item list
The item list lists everything in the set, counted or not, in the sheets' own words. In a window 1024 pixels wide or wider, it always shows beside the sheet. In a narrower window or on a phone, open it with Items or L. Its header holds This sheet, New item, Find an item, and View options. View options picks what the list shows. First, Group by offers the set's own levels, named in the set's words (such as Floor), and Sheet, with Then by, Sort by, and Split by tag or size under it. Split by tag or size shows each item whose marks print two or more tags or sizes as one line per value, in its card, in Reports, and in the bid. Next, Trades keeps the list to My trades, your company's trades, or shows All trades or one trade. Type, Layers, and Regions narrow it further, and Prices shows All items, only the items with No price, or only those Left out: not your trades. Each row says All while nothing narrows it, or what you picked. Columns opens the list's extra columns, such as Level, Room, and Tag, to turn on or off. Hide all marks sits at its foot. This sheet keeps the list to the open sheet and stays as you left it.
Under the header, one line says how far the takeoff has come, such as 129 of 141 counted · 12 of 141 checked. While Exa measures, it reads, for example, AI takeoff · 5 of 8 sheets measured. Once the takeoff is finished, Review (Shift+R) sits on the header. Every trade is open, and things not counted yet sit under Not counted yet.
Each row shows what the thing looks like, its name, and its quantity. When an item needs a look, the line under its name says why, such as Needs review or Check scale. Click Check scale to fix the sheet's scale, Try again to run the item's stopped edit again, or any other to open the item. A row the bid leaves out shows muted. When the list is wide, each row also shows its price and amount. A change since the sheets' last issue shows on the item, such as Since last issue: 180 SF → 216 SF.
Tick the box beside items, or beside a trade to pick all of it, and the bar reads, for example, 2 items, with Merge and Fill prices. Its More (⋯) menu holds Hide on sheet, Price with Exa, Apply a template…, and Delete. Clear or Esc clears the selection.
What the sheet itself says, such as the callouts it Points to, is in the sheet's menu, opened from its name in the project's bar. Click a callout to open the sheet it names.
An open item
Click a row, or press Right on it, to open the item in one card under the item list, the list's full width. The list above it stays as it is. Drag the line between the list and the card to give either one more room. The card shows each sheet that holds it, with that sheet's quantity and its marks under it. Click a mark to go to it and pick it, or hold Ctrl, Cmd, or Shift to add it to the marks already picked. Remove from this sheet in its menu takes the item off the open sheet.
The open item's buttons are Draw to add marks and Find more to look for more of them. Under them sit its cost lines: click one, or Add price when there are none, to edit them with Add line and Price with Exa. Then come its facts, such as its Kind and what a legend, schedule, or spec prints for it.
Its menu holds Color…, Look…, Customize fields…, Move to layer, Move to group, Mark checked, Hide on sheet, Lock on sheet, Show only this, Remove from this sheet, Merge with…, Duplicate, Save as template…, and Delete item. A row's own menu holds Add back, Add price…, Rename, Change quantity…, Color…, Mark checked, Hide on sheet, Lock on sheet, Show only this, Merge with…, Duplicate, and Delete item; only a row's menu has Add back, Add price…, Rename, and Change quantity…. A deleted item or mark comes back from Undo on the Removed toast.
Press Up and Down to move between rows, Right or Enter to open a row's item, Left to close it, Shift+Enter to mark the item checked and move to the next, Delete to delete it (or every picked row), and F2 to rename it. Esc first lets go of anything picked, then closes the item and puts the sheet's view back where it was. A mark picked on the sheet lights its row in the open item.
Needs you
Start takeoff sits at the end of the progress line under the item list's header while sheets wait to be measured, and opens the takeoff's plan right there: which sheets and which trades, then Start takeoff. See AI takeoffs.
Needs you at the foot of the item list lists everything that waits for you. Each line is one sheet, one item or one file, by its own name, with what shows the problem and the button that fixes it. A sheet's line shows the sheet in small, and its name opens it. An item's line shows the item's picture. On a price line or a line for an item that may be listed twice, the item's name opens it. Press N to go to the first line's button. Once a takeoff has finished and nothing waits, the foot reads Nothing needs you.
The lines sit in three groups, in this order: The takeoff did not finish, Before you send the bid and Optional. Each group's head counts its lines. Each kind of line says once why it matters, such as "No price · adds nothing to the bid total". A long kind shows its first lines, then a line such as 3 more with no price that shows the rest in place. A line leaves once the problem is fixed. The list grows up to half the sidebar's height, then scrolls with the group heads kept in view.
The takeoff did not finish comes first. A takeoff that stopped with sheets not measured shows those sheets in small and offers Carry on, Measure these 3 sheets or Contact us. Measure these 3 sheets measures them right away. When the sheets need a new plan, Measure these 3 sheets opens the takeoff's plan of them instead, which you start with Start takeoff. With more than 12 stopped sheets, 4 more shows the rest. A takeoff paused until AI usage is added says what it waits for. An admin gets a button to go on, such as Add extra usage, Raise the limit or Choose a plan, and a member gets Ask an admin. Each sheet the index could not read has its own line with Read the set again and Open A-101. "The item list did not load" offers Load the list again, and a read cut before any sheet offers Choose sheets to measure.
Each sheet that did not finish loading has its own line with Load A-101 again, and a sheet that cannot be opened offers Upload A-101 again. A sheet waiting for AI usage offers the same button as a paused takeoff. The load button and the usage button show to people in the project's company; anyone else reads "The project's team can do this". A takeoff import that stopped offers Run it again and Not now.
Before you send the bid lists each sheet with no scale, with how many items wait on it and Set the scale on A-101, and each sheet whose scale is in doubt, with Check the scale on A-101. Items that need a height offer Give height. Each item with marks to check shows those marks in small, each with Show it on A-101, and Count these 3 or Remove these 3. The marks you count or remove leave the line at once, and come back if the change is not saved or you undo it. An item with more marks than fit offers 2 more in Review, which opens the item in Review. If the marks cannot be loaded, the line offers Review instead. Each sheet listed on the drawing list but not uploaded offers Upload A-101 and Not in this set, and This is it beside an uploaded sheet the list may name. Each upload with pages that were not read offers Read those pages again, each sheet whose tables were not read offers Read the tables again, and schedule items with no count offer Match them again. Each item with no price has a price box on its line, priced per the item's unit, such as per SF, or Add a price.
Optional lists each item that may be listed twice, with both pictures, a button that merges the two into one item, and Keep both. Keep both keeps them as two items, so both now count in the bid, and offers Undo. Each file with a takeoff to import offers Import, and each zip with files inside offers Extract, each with Not now. A zip that could not be extracted offers Try again. When you gave the takeoff your own list, "Not on your list · drawn, not measured" names each drawn thing the list did not ask for, and its sheet's name opens that sheet.
Someone who can't edit the project sees only the sheets listed but not uploaded, the sheets that did not finish loading and why the takeoff did not finish, with An editor can do this in place of the buttons. An editor invited from another company sees no pages or tables to read again: those reads are started by the project's own company. Before the set is measured, their item list reads Not measured yet, since the project's own company starts the takeoff.
When the figures on screen may be behind, a line says May be out of date, with Try again beside it. The chat's run card holds the work timeline: one row per sheet with each step Exa took, how long it took, and what it found. The bid is written and opened from Bids in the project's bar.
On a phone
On a phone, one bar at the top holds the Menu button, which opens your projects and chats, with Search, Knowledge, Templates, Help, and your account, then the project's name, the Reports and Bids icons, Chat, Items, and New, over the open sheet's bar. On the sheet's bar, the sheet's place in the set opens the sheet list. Chat switches between the chat and the project, and Items shows or hides the item list. Held upright, the item list rests low under the sheet, with a row of the sheet's items, so the drawing has the screen: press Items or drag its grip to make it taller or shorter. Held sideways, it sits beside the sheet. The tool bar sits in a strip under the sheet. The sheet's Display is in the sheet's menu, opened from its name.
Without a connection
With no connection, a line says You're offline. Waiting for your connection to return. Projects and sheets you have already opened on this device still open from the copy kept there. A sheet never opened on this device shows the offline mark in its place and draws by itself once the connection is back.
Keyboard shortcuts
Each button on the bars shows its key where there is room, and the key presses it. Press Shift+L for the sheet list, L for the item list in a window narrower than 1024 pixels, J for the chat, and \ to hide or show the chat and sheet list. Page Up or Page Down changes sheets, G goes to a sheet, S opens the scale, and N goes to the first button in Needs you. Ctrl+Z (Cmd+Z on a Mac) undoes and Ctrl+Shift+Z redoes. Press Ctrl+K (Cmd+K on Mac) to search, and Ctrl+/ (Cmd+/) for the full list of shortcuts, also under Help then Shortcuts.
