Skip to main content

Symbols and folders

Organize measurements with symbols and folders.

Written by Sarah Chen

Symbols and folders help you organize takeoff measurements into logical categories. Symbols represent individual measurement types with specific properties, while folders organize related symbols together.

Understanding symbols

A symbol is a named measurement type with its own appearance and properties. Each symbol includes a name, type (Count, Linear, or Area), color, and measurement value. When you create a measurement on the canvas, you are creating an instance of that symbol.

Symbol appearance varies by type. Count symbols have configurable Dot style and Dot size. Linear symbols have line color, thickness, and dashed or solid style. Area symbols have fill color, opacity, and optional stripe patterns.

Creating symbols

Symbols are created automatically when you start a new measurement. Select a measurement tool with no item of its kind picked, configure the symbol properties in the symbol panel (name, color, appearance), then click Start to begin drawing. The symbol appears in the sidebar when you complete your first measurement.

The symbol panel

The symbol panel appears in the item list when configuring a new symbol. The header shows the color picker, name field, and action buttons. Below that, expandable sections let you configure dimensional properties like diameter, width, wall height, depth, slope, line style, stripe patterns, offset, and display unit. For an existing symbol, click its row in the item list to open it, then open More to change the same settings.

Folders

Folders organize related symbols. They help structure your takeoff for easier navigation and reporting. Folders can be nested to create subfolders within folders. In Reports, a Folder column shows each symbol's folder.

Managing symbols

To move a symbol into another folder, open its menu in the open item, choose Move to group, and pick the folder. Choose Home to take it out of every folder. The same menu holds Move to layer to reassign its layer. The same menu holds Duplicate, which copies the symbol with all its properties and measurements. See Layers for more on organizing by layer.

To merge symbols, open one's menu, on its row or the open item, choose Merge with…, then choose the symbol to merge into it. Or tick their rows in the item list and click Merge on the selection bar. To merge from the sheet, pick marks of two or more symbols and choose Merge these 2 items in the More (⋯) menu of the bar at the foot of the item list.

Visibility controls

Open a symbol's menu, on its row or the open item, and choose Hide on sheet to hide it on the sheet, or Show on sheet to bring it back. Hidden items remain in your takeoff data but do not display on the sheet.

Search and filter

Press Ctrl+K (Cmd+K on Mac) or / to search. Type a name to find symbols anywhere in the project, regardless of the current folder, layer, or type filter. To narrow what the sheet shows, pick a layer under Layers in the item list's View options menu.

Did this answer your question?