Starter packs are pre-built collections of symbol templates and line items organized by construction trade. Each pack gives you a ready-made set of measurement types and associated cost items so you can begin takeoffs without building everything from scratch.
Which plans include templates
Applying any template, including ones your team made before, works on every plan. Installing trade starter packs works on every paid plan, Starter included. Saving your own templates and template packs, and changing them, works on every paid plan. Templates your team already saved keep working on any plan. See Subscription plans for the full comparison.
Available trades
Starter packs cover over 30 trades including drywall, electrical, plumbing, landscaping, HVAC, roofing, concrete, and more. Each trade contains multiple collections grouped by work category, and each collection contains templates with measurement types (count, linear, or area) and associated line items.
The Templates page
Open Templates from the column of icons on the left edge of the screen, just below Knowledge. On a phone, it is a row at the top of the home panel. The page lists the cost lines each takeoff item brings into a bid, with their prices, the same for every project. See Creating estimates for its grid.
The Template pack dropdown narrows the grid to one pack, or shows All templates.
What's inside a pack
A collection preview displays all of its templates. Each template has a name, a measurement type icon (count, linear, or area), and a list of line items beneath it. Line items show their name, category (Material, Labor, Equipment, Subcontract, or Other), and unit of measure when applicable. This lets you evaluate exactly what you are adding before committing. You can also refine the collection first by typing into the What do you want to change? prompt. Exayard adjusts the templates and line items before you install.
Installing collections
From the collection preview, click Install to add that collection. Exayard creates a new template collection with the corresponding symbols and line items, and says Collection added. You install collections one at a time from their previews.
Installed collections appear on the Templates page alongside any you created yourself.
Using installed templates
Installed templates work identically to ones you create yourself. When you draw a new takeoff item on a sheet, open the item menu on the chip just above the bar and choose New item from a template to start the item from it. The associated line items carry over, giving you pre-configured cost tracking tied to each measurement type.
Saving line items as a template
Turn work you have already priced into a reusable template. This needs a paid plan. On the Templates page, select rows with their checkboxes and click Save as template. On a sheet, an item's More menu in its details also has Save as template. Name the template, pick a template pack (or create a new one on the spot), choose the takeoff type (count, linear, or area), and save. The selected items copy into the new template with all their values, prices included.
Templates in the AI assistant
The AI assistant can browse your template packs and apply a template to the project in chat. Ask it to use a saved template, and after you confirm, it creates the takeoff symbol with the template's priced line items instead of inventing prices. The new symbol has no measurements until you draw or count it on your plans.
Creating your own templates
Beyond starter packs, teams on any paid plan can generate custom collections for their own workflows. On the Templates page, open the Template pack dropdown and choose New template pack. Describe what you want to estimate in the What do you want to estimate? prompt, and Exayard generates a full collection: name, color, templates, and line items. Review it in the preview, refine it with the What do you want to change? prompt, then click Save. Once saved, you can edit and delete its lines on the Templates page.
Template collections are organization-level and shared across every project in your organization. Editing or deleting a collection affects all projects. When you create a pack while saving a template, you choose its visibility: Public (shared with the community, the default), Organization (visible to all organization members), or Private (only visible to you).
