Compare sheets lets you compare two pages by layering one on top of the other. Use them to track changes between revisions, coordinate across disciplines, or check as-built conditions against design documents.
Opening Compare sheets
Click Compare on the tool bar at the foot of the sheet, or press C. When the tool bar is short of room, Compare is under More tools. If the current page has no comparisons yet, the sheet picker opens at once. If it has some, the Compare popover lists them, with New.
Creating a comparison
The sheet picker reads Pick another sheet to compare and lists the sheet's Other revisions first, then every page in your project. Select the page you want to overlay on top of your current page and the alignment interface appears.
Aligning pages
After selecting a comparison page, the overlay appears on the canvas with adjustable positioning. Drag the overlay to align it with the base page, matching reference points like corners, gridlines, or title blocks. Use corner handles to resize the overlay if the pages are at different scales. Use arrow keys for fine adjustments, or hold Shift for larger steps.
Adjust the Opacity slider to control transparency while aligning. Click Compare when alignment is complete.
Viewing comparisons
Completed comparisons appear listed in the Compare popover. Click any comparison to activate it. The overlay renders with a color-coded legend:
Color | Meaning |
Black | Unchanged |
Blue | Added |
Red | Removed |
Once a comparison is shown, the compared sheet fades in over the open one. The Opacity slider under the legend sets how much of it shows, and holding Swap shows the other sheet on top for as long as you hold it. A sheet opened beside the chat has the same two controls.
On a sheet from a later issue, the popover also lists Changed since the last issue: each item whose quantity changed, with its old and new figure, such as Wall type A 10 → 14.
Click the eye icon next to an active comparison to toggle visibility without losing the comparison data.
Common use cases
Revision tracking: Compare different versions of the same sheet to identify changes. Upload both revision versions as separate pages and create an overlay between them.
Discipline coordination: Layer different trade drawings to check for conflicts between landscape, irrigation, and grading plans.
As-built comparison: Compare completed work to original plans. Add the as-built drawing or site photo as a page in the project, then overlay it on the design document.
Managing comparisons
You can create multiple comparisons for a single page to compare against different revisions or trade drawings. Switch between comparisons by clicking different items in the Compare popover, which shows your five most recent comparisons for the page.
