Upload a plan set and Exayard reads it automatically: it builds the sheet index, finds schedules, legends, notes, and spec sections, and compares sheet revisions. There is no button to press. Set analysis uses a small amount of your company's AI usage for each sheet it reads. If this month's AI usage is used up, the pages are still uploaded and ready, and the sheets are read by themselves once usage is available again.
While the set is read
While Exa reads or counts your sheets, the progress line under the item list's header shows how far it has come. See each sheet on the run's card in the chat opens the work timeline, with a row for each sheet. See Understanding the interface.
If the tables on some sheets could not be read, Needs you at the foot of the item list shows anyone who can edit the project one line per sheet, such as "Tables on E-201 were not read". Read the tables again reads them once more, and says Reading while it works.
Browsing what was found
With Group by set to Type in the sheet list's View options menu, the list shows the sheets under Drawings, Schedules, Legends, Notes, Specs, and Text and specs, each heading only when the set has pages of that kind. In grid view (set Display to Grid in the same menu), sheet tiles carry chips marking what is on them, like Legend, Schedule, or Spec section.
Sheets named in the drawing index but not uploaded show grayed in their place in the sheet list. Needs you at the foot of the item list gives each one its own line, by its number and title, under "On the drawing list, not uploaded", with Upload A-101 and Not in this set. When the index may name a sheet you already uploaded, the line offers This is it beside the likely sheet.
Not in this set puts that sheet away for everyone on the project, on every device. A sheet the index names later is asked about again. Someone who can't edit the project sees the line with An editor can do this.
Adding schedule quantities to your takeoff
In grid view, click the Schedule chip on a sheet's tile to open the parsed table, like a door, window, or finish schedule. Choose how rows are named under Name from (Tag, Description, or Tag and description) and where the quantity comes from under Quantity (Quantity column or One per row). Tick the rows you want and click the add button, such as Add 12 to takeoff.
Rows that can't be counted are refused with a reason, and purely informational tables never use AI usage. In reports, counts that came from a schedule carry a Read from a schedule badge so you can tell them apart from symbols detected on the drawing.
The schedule cross-check
When an AI takeoff runs on a set with schedules, the double-check step compares the counted items with the schedule quantities. An item the schedule disagrees with shows both numbers in the item list's Drawings say column (turn it on under Columns), such as "4 · found 5", and the open item shows the schedule's number beside Schedule. A sheet opened in a chat pane shows both on the item's row, such as "Schedule 4, found 5". Review with This sheet on lists it at the top of the sheet's check, such as "Set says 4 · found 5". Find more on the open item looks for more marks like it. See AI takeoffs.
Findings never change your numbers silently. What wants your attention is listed in Needs you at the foot of the item list, one line for each sheet, item or file that waits.
Addenda and revisions
Upload an addendum or a revised sheet and Exayard pairs it with the sheet it replaces. The older sheet gets a Superseded pill beside its name in the project's bar, and on its tile in the sheet list's grid view. Its row in the sheet list reads Superseded.
The replaced sheet's menu starts with This sheet has a newer version, then its ways out: Open the current version and See the two versions lined up. When the two versions need lining up by hand, Line up the two versions is there too. In grid view, click the pill on a tile to see What changed in this revision: the two versions side by side with boxes marking areas that differ.
When your marks move to the current version, the menu says how many, such as "12 marks moved to the current version", and how many to check. Undo the move takes them back, and Move the marks to the current version moves them again. The old sheet's marks are grayed and count nowhere once moved.
The comparison reads the drawn lines, so a change made only in color, hatch, or a small text stamp can be missed. Treat the boxes as areas to review, not a complete list of changes.
Asking Exa about the set
The chat assistant reads everything set analysis produced. Ask for an orientation of the set, the missing sheets, what a spec section requires, or how an addendum affects your takeoff (a suggestion chip appears when an addendum arrives). You can also ask Exa to extract bid requirements: alternates, allowances, unit-price schedules, and bid-form requirements, quoted verbatim from the specs with sheet and section citations.
