Skip to main content

Creating estimates

Turn your takeoff measurements into professional estimates.

Written by Sarah Chen

An estimate in Exayard is built from your takeoff symbols. Each symbol can carry one or more line items that define the materials, labor, equipment, and other costs for that scope of work. Together, these line items form your project estimate.

How estimates are structured

Every takeoff symbol you create (area, linear, or count) can have line items attached to it. Line items use formulas that reference the symbol's measurements, so quantities stay synchronized with your actual takeoffs. When you update a measurement on the plan, the line item recalculates automatically.

To see every line item your templates bring into a bid, open Templates on the left edge of the app. The page is described below.

Adding line items to symbols

Click an item's row in the item list to open the item in its card at the foot of the list. Under its quantity sit its cost, its cost lines, then Add line and Price with Exa. Each line item needs a cost type, a formula, and product details like name, cost per unit, and unit of measure.

Line items sit in one list, in cost type order: Material, Labor, Equipment, Subcontract, and Other. Each line shows its type under its name. Add line adds a line from a template or your prices, or a Blank line of the type you pick. Drag a line to reorder it among the lines of its type. See Line items and pricing.

Working with formulas

Formulas define how quantities are calculated from your takeoff measurements. A formula like [NetAreaSqFt] pulls the measured area directly. You can combine variables, add constants, and apply math operations to model complex calculations.

Each line item also supports a Waste percentage and a Round up to nearest value. Waste adds a buffer to account for material loss, while rounding ensures quantities align with how materials are sold (e.g., round up to the nearest box of 12).

Linking products

Line items can be linked to products from your product lists. When you link a product, the line item takes the product's name, SKU, cost per unit, unit of measure, and markup percentage as they are at that moment. Changing the product later does not change line items already linked to it. See Lists you keep by hand.

You can also type a custom name without linking to a product. This is useful for one-off items that do not appear in your standard product catalog.

Using AI to add line items

Under an item's cost lines, open Add line and choose Ask Exa to suggest. Exa, the AI assistant, gets the request in the project chat, suggests materials and labor for the item, and adds them as line items you can review and adjust. To price the lines that have no price yet, click Price with Exa.

The Templates page

The Templates page lists the cost lines each takeoff item brings into a bid, with their prices. Each template is named in a header row above its lines. Columns include Type, Name, Cost per unit, Unit, Client option, Waste %, and Round up to nearest. SKU, Price source, Markup %, and Formula wait in the Columns picker at the grid's corner. Click any cell to edit it inline.

Select multiple rows with checkboxes to perform batch actions like deletion. Use the Type filter in the toolbar to show only specific cost types like material or labor, and the Template pack dropdown to narrow the grid to one pack. See Templates and starter packs.

Pricing the bid

Before a bid is written, Bids in the project's bar shows the draft bid as a table of every item from your takeoff, the same rows as the item list and Reports. Its columns are Item, Quantity, Price, Amount, and In bid. Where a row has no figure yet, it shows what stands in the way, as the item list does, such as No price or No scale. Hover it to see why. Click a row to see the item on its sheet beside the table.

The In bid cell says each row's place in the bid: Included, Alternate, or Left out. Click it to change the place. For an alternate, choose Alternate name and type the name in the cell. A row you leave out stays in the table, grayed, with Add back.

The foot of the table shows the Bid total, or No price when nothing has a price, and a count such as 2 no price. When the bid adds rows on top of the items, the foot first shows the Subtotal of the items, then each added row with its amount, such as Escalation to May 2027, your company's own rows, and each tax, and then the Bid total. Write bid turns the draft into a bid document. While something must come first, such as a takeoff still at work, Write bid is grayed, and pointing at it says what holds it back.

Over the draft, Before you write counts what to settle first, such as Before you write · 7 of 10. Each row says what it checks and has one button: Prices offers Add price, which prices every line that can be priced now, Scale offers Set scale, Written scope offers Review, and Letterhead and terms offers Show. A row that is settled is ticked. The same list stays over the bid list once a bid is written.

Once a bid is written, its editor shows "3 lines on this bid have no price yet." with Price these lines. Pricing them builds the bid again from the takeoff. If the bid holds your own edits, Exayard asks first (This bid has your edits), and your edited copy stays in the bid's history. A bid you already sent is never changed in place: Price them in a new version makes a new version, and the bid you sent stays as it was. A bid sent with lines still unpriced shows your client a Partial total, and those lines read Not priced.

The Written scope row of Before you write lists things the specifications ask for that the bid does not price, such as testing or spare stock, and alternates in the set that are priced inside the base bid. Click its Review to see them, and again to close the list. Move to an alternate moves such an item's lines into one of the project's alternates.

Did this answer your question?