Skip to main content

Estimator setup

Build a knowledge base so the AI can generate accurate estimates for your clients.

Written by Sarah Chen

Upload your drawings and Exayard measures them for you: every drawn area, run and symbol, with no measuring by hand. Each line of the estimate is priced from your own prices when you have them, otherwise from the published price book or local market prices for your area, and each line shows which. Your own prices are optional; they make the estimate closer.

The Estimator is the AI that writes your estimates. It also draws on your prices, documents, and websites, so estimates follow your actual pricing, past bids, and company standards.

Prices

Open Knowledge from the column of icons on the left edge of the screen. The Prices section lists every price Exa uses: price lists you uploaded, lists you keep by hand, and your Labor rates. Exa prices your estimates from them before it uses the published price book.

Admins click Add prices and choose what to add:

  • Upload a price sheet reads a supplier's price list, a quote, or an invoice and keeps it as one of your price lists. When the section is empty, you can also drop the file on it. See Your price list.

  • Start a list by hand creates a list you fill in like a spreadsheet. See Lists you keep by hand.

  • Labor rates opens your rates, crews, and equipment. See Labor rates, crews, and equipment.

When you upload a spreadsheet price sheet, Exayard shows how it reads the file before keeping it. Each Price list field, such as Description, Price, and Unit, is matched to a File column, with an example from the file and a preview of the rows. Change any match that is wrong. When the file prints a price only in parts, such as separate material, labor, and machine columns, pick those columns under Price parts. They are added up into the price.

Every list prices your estimates. A list you keep by hand also feeds Exa's chat unless an admin chooses Hide from Exa's chat in its menu; the row then shows Used for pricing, not in chat answers, and Show in chat (or Show to Exa's chat in the menu) turns it back on.

Documents

The Documents section holds reference files Exa reads when it answers and estimates. Click Upload files to add past bids, material specs, scope documents, or company standards. Supported formats include PDF, DOCX, XLSX, CSV, TXT, and images. A file shows Reading... while Exa takes it in, and is ready once that line goes away.

When a spreadsheet or PDF document holds prices you want Exa to price with, choose Use its prices from its menu. It opens the same import as Upload a price sheet, and the result is kept as one of your price lists.

To remove a document, click the menu on its row and select Remove. Exa stops using it, but the file stays in your organization.

Websites

The Websites section lets the AI reference web content alongside your files and catalogs. Click Add website to read a whole site, or Add a single page when you only need one URL. Crawled content syncs the same way uploaded files do.

Instructions

The Instructions section holds guidance for how Exa behaves. Under Exa in the app, write guidance like "Prefer conservative pricing on commercial bids" or "Always cite sources." Once you have a customer-facing widget, Website widget, below it, sets that widget's instructions. See Custom instructions.

Testing the estimator

On a wide screen, Exa's chat sits to the right of your knowledge, so you can try each thing you add right away. On a narrower screen, click Test what Exa knows to open it. Type a question to see how Exa answers from your knowledge, or click a starter chip (Sample bid, Look up labor rate, Price a material, or Waste factor) to test your setup in one click.

Exa searches your prices, documents, and websites, then answers with citations. Click any cited source to preview the referenced file with the relevant passage highlighted. For spreadsheets, the matching row is highlighted automatically.

Click New chat to start a fresh conversation.

How it works with the widget

The estimator powers the AI chat in your customer-facing widget. When a visitor asks for a quote or pricing through the widget, the same documents, websites, and prices are used to generate responses.

Configuring the estimator in settings directly improves the quality of estimates your widget provides to leads. For details on setting up the widget itself, see Widget setup.

Tips for better estimates

None of this is needed for a first estimate. Upload documents that reflect your current pricing and scope standards. The more specific your knowledge base, the more accurate the AI's output. A price list with up-to-date unit costs paired with a few recent bids gives the estimator strong context for new estimates.

You can also attach files directly in the chat input to include project-specific documents like plans or specifications alongside your knowledge base. This lets you combine general pricing data with the details of a specific project in a single conversation.

Did this answer your question?