Line items and pricing

Add and manage line items with materials, labor, and equipment costs.

Written by Sarah Chen

A line item represents a single cost component attached to a takeoff symbol. Each symbol can have multiple line items covering different cost types, and each line item uses a formula to calculate its quantity from the symbol's measurements.

Cost types

Every line item has a cost type that categorizes what it covers.

Type

What it covers

Material

Raw materials like concrete, pavers, or mulch

Labor

Crew time and hourly rates

Equipment

Rental, fuel, or owned equipment costs

Subcontract

Work performed by subcontractors

Other

Miscellaneous costs that don't fit other categories

On the Templates page, each row shows its type with an icon. Click the Type cell to change it using the inline dropdown. A line nobody gave a type reads Not set.

Adding line items

Click an item's row in the item list to open the item in its card at the foot of the list. Its cost lines sit in one list under its quantity, and each line shows its cost type under its name. An item with no price has Add price in its row's menu and on the open item, which opens the item at that line.

Add line, under the list, holds every way to add a line:

Choice

What it adds

A template

The template's cost lines. Replace current lines swaps out the ones already there

Cost book rows for this item

Your local cost book's rows for the item, while it has no lines

From your prices

A new material line, opened so you can pick a product in its Name field

Add your price list

Opens the price list upload, for an administrator with no list yet

Ask Exa to suggest

The AI assistant suggests materials and labor for the item in the project chat and adds them as line items

Blank line

An empty line of the cost type you pick

Price with Exa, beside Add line, asks the AI to price every line of the item that has no price yet. It never touches a line you priced or edited, and it shows AI takeoff items only on a project with no AI takeoff. With a draft bid written, Updates the draft bid appears under the button. If the bid was sent or holds your own edits, Exayard asks first, as described in Creating estimates.

Drag the grip handle on a line item to reorder it within its cost type.

On the Templates page, add a new row by scrolling to the bottom and typing into an empty row. The grid auto-saves your edits.

Pricing fields

Each line item has several pricing fields you can set.

Field

Purpose

Name

Description of the item (or linked product name)

SKU

Product identifier for tracking

Cost per unit

Price per unit of measure

Unit

Unit of measure (ea, sqft, lf, etc.)

Markup %

Percentage markup applied to this item

Each line item carries its own currency. Set it from the currency selector on the Cost field in the editor, and amounts format in that currency throughout.

Set these fields directly on the Templates page by clicking a cell, or by opening a line on an open item, where you also configure formulas. On the Templates page, SKU, Markup %, and Formula are turned on from the Columns picker.

Where a price came from

The Cost per unit cell names where each price came from. A line with no cost yet reads Needs pricing. A sparkle marks an AI-estimated price you may want to verify. A line that still needs your decision keeps an amber marker.

When items need attention, chips above the grid show the counts, such as 3 no price or 5 AI-estimated prices. Click a chip to filter the grid to exactly those rows. The toolbar's Price source filter (All price sources) offers the same narrowing by hand:

Filter

Shows items whose price

Exa's price

Was proposed by the AI

Price list

Came from one of your price lists

Price you entered

Was typed in directly

Imported file

Arrived with an imported file

Local market price

Is a market estimate for your area

Needs pricing

Doesn't exist yet

A missing cost is deliberate: the AI never invents a price it can't support, so an unpriced item is a to-do, not an error. To put your own prices on these lines, see Your price list.

When a price list changes a price after a line took it, the line shows "Price moved: was ..., now ..." with Update and Keep. A chip above the grid counts these lines, such as 2 prices moved, with Update all and Keep all.

Prices from the book

On an open item, click a cost line to open it, then press the chip at its top, which names the line's price source, such as Needs a price. When your local cost book can price the line, the chip's menu shows Fill price (your prices first). The same menu can show a figure the AI held back, such as AI price $12.40/LF. Choose it to make it your price. To fill every line of an item still without a price, open the menu beside Price with Exa and choose Fill prices (your prices first). To do the same for several items, tick their rows in the item list, then click Fill prices on the selection bar.

Client options

The Client option column marks a line item as optional work the client can choose to add on a shared bid. Click the checkbox in a row to toggle it. See Client options for how options appear to clients.

Formulas and quantity

Formulas calculate quantity from takeoff measurements. A formula references built-in variables like [NetAreaSqFt], [NetLinearFt], or [Count] depending on the symbol type. You can combine variables with arithmetic for complex calculations.

Two additional fields refine the calculated quantity. Waste adds a percentage buffer for material loss. Round up to nearest rounds the quantity up to match how materials are sold, such as rounding to the nearest whole unit or case.

Linking products

When adding or editing a line item, the Name field doubles as a product selector. Start typing to search your product lists, then select a product to inherit its pricing fields. Linked items show the product's SKU, cost per unit, unit of measure, and markup automatically.

If you type a name that does not match any product, it becomes a custom (unlinked) entry. You can also create a new product directly from the selector without leaving the editor.

Editing in the table

The Templates grid works like a spreadsheet. Click any cell to edit, press Enter to confirm, the arrow keys to move between rows, Escape to cancel, and Tab to move between cells. Select multiple rows with checkboxes for batch deletion.

Filter the grid by cost type using the Type dropdown in the toolbar. You can also filter by template pack using the Template pack dropdown (defaults to All templates) to see only line items from a specific pack. On a phone, these filters share one Filter menu.