A list you keep by hand (a product catalog) holds the materials and other priced items you buy, with your prices. Its products are available across every project in your organization, so you only need to set up pricing once. Labor pricing lives in its own place. See Labor rates, crews, and equipment.
Where your lists are
Open Knowledge from the column of icons on the left edge of the screen. The Prices section lists your lists beside the price lists you uploaded and your labor rates. Click a list to open its products in a table. Every list prices your estimates; one with a Draft badge waits for review first.
A list feeds Exa's chat too, unless an admin chooses Hide from Exa's chat from its menu. Show to Exa's chat turns it back on.
One list can be the Default. The default list can't be deleted.
Starting a list
Admins click Add prices in the Prices section and choose Start a list by hand, then name it in the New price list dialog. The list opens with plenty of empty rows, so you can type or paste into it like a spreadsheet. To rename, duplicate, or delete a list, open it and click its name at the top of the table. Deleting a list takes you back to the Knowledge page.
To bring in a supplier's price sheet, a quote, or an invoice instead, choose Upload a price sheet. It is kept as a price list of its own. See Your price list.
Adding products
Open a catalog and click Add products in the toolbar. The Add products dialog opens with a row ready for you to type a product. Each product has five core fields:
Field | Description |
Name | The product description or title |
SKU | A unique identifier for the product |
Cost per unit | The base price per unit, with a currency selector so a catalog can mix currencies |
Unit of measure | How the product is sold (each, bag, roll, sq ft, etc.), chosen after the / beside the cost |
Markup | Percentage markup applied to the cost |
Click Add another product for each extra row. The button at the bottom counts your rows, for example Add 3 products, and adds them all at once.
To skip the typing, paste a price list or supplier quote into the box at the top of the dialog and click Read list. AI reads the product names, costs, and other fields into rows, so you can check them before you add them. Reading a list uses your company's AI usage. If this month's usage is used up, anyone on the team can add extra usage once, and admins can turn on automatic extra usage.
Importing from files
Click Upload a file at the bottom of the Add products dialog to add products to the open list from a file. Drop a file on the upload area or click it to choose one. Supported formats are CSV, XLSX, PDF, and TXT. Click Type products instead to go back.
For CSV and Excel files, Exayard reads the column headers and maps them to product fields automatically. An example value from the file appears beside each field so you can check the mapping. Change any wrong mapping with the column dropdowns. Name, Unit of measure, and Cost per unit must be mapped before you can import; SKU and Markup % are optional.
For PDF and plain text files, AI reads the products from the document. This handles unstructured price lists and supplier quotes that don't follow a strict table format, and uses AI usage like Read list. A PDF starts importing as soon as you choose it: the dialog closes, and its products appear in the catalog once the document has been read.
For CSV, Excel and text files, tick These prices are mine to use (my own, public, or licensed for this use), then click Import. The products are added to the list you have open.
A list with a Draft badge holds imported products waiting for review, and does not price your estimates yet. Click Approve in the banner at its top, then choose Keep separate to make it an active list, or Merge into... to move its products into another list.
Editing products
Click a cell in the product table and start typing to replace its value. To change what is already there, double-click the cell or press Enter. Changes save automatically.
To see every field of a product at once, click the pencil at the end of its row. The Edit product dialog opens, where you can change any field and click Save, or click Delete to remove the product.
To remove several products together, tick the checkboxes beside them and click Delete in the toolbar.
Linking products to estimates
When you add a line item to a takeoff symbol, you can link it to a product from your lists by picking the product in the line item's Name field. Linking copies the product's SKU, cost per unit, currency, unit of measure, and markup percentage onto the line item as they are at that moment, and the line item shows the product's name. Changing those values in the list later does not change line items already linked to it.
You can change the SKU, cost, unit, or markup on a line item without breaking the link. This is useful when a project requires a one-time price adjustment. Typing a different name in the Name field unlinks the product.
Custom properties
If the built-in fields aren't enough, your organization can define custom properties for products in Settings. Custom fields (like supplier, lead time, or color) appear alongside the standard fields in the product form and table columns. See Custom properties for setup details.
