Skip to main content

Using the AI assistant

Get help from the AI assistant for your takeoffs.

Written by Sarah Chen

Exa is Exayard's AI assistant, available throughout the application to help you work with construction plans and manage your projects. You can ask questions, upload plans and other files for analysis, and request actions on your takeoffs and estimates.

Opening the chat

On the home page, start a conversation from the central omnibox. Inside a project, the chat starts folded so the page has the room. Click Chat, the Exayard logo at the start of the project's bar, or press J, to open the chat beside the project page and any sheet you open, so Exa has context about your current work.

Drag the divider between the chat and the project to resize it. Click Chat again, or press J, to fold the chat. Expand chat lets the chat fill the window, and Shrink chat puts the project page back. A dot on the folded logo means Exa is working or has replied. On a phone, the Chat button on the project's bar opens the chat.

The chat has two tabs at the top. Exa is the AI assistant. Team is for collaborating with teammates; Exa replies only in the Exa tab. The chat opens on the Exa tab by default.

Type your message in the input field and press Enter or click the send (up-arrow) button. Exa responds with streaming text that appears as it generates, so you can read the response as it comes in. If a reply is slow, the chat says "This is taking longer than usual". If it takes too long, it says "This reply is taking longer than usual. Try again in a moment." and offers Retry when it can send your message again.

Past chats

On the Exa tab, New chat in the chat's header starts a fresh one, and Past chats lists your earlier chats with this project. Each chat on the home page has a ⋯ menu with Rename, Pin chat, Move to project, Remove from project and Delete. Move to project, or Add to project for a chat that has none, lists your projects with a Search projects box, and New project makes one for the chat.

Uploading files

Attach files with the + button in the input area. You can add PDFs, images (JPEG, PNG), spreadsheets, and text files. PDFs and images are sent to Exa for analysis; other files are stored and available to Exa's tools. Attachments are saved to your project and can be referenced in the conversation.

Once every sheet of the plans you add is read, Exa says in the chat the takeoff it would run, as described in AI takeoffs. When you send a picture of a plan, Exa can offer a takeoff on a card instead. Nothing is measured until you click Start takeoff, and the results appear in the chat when the run ends.

Sheets beside the chat

In a chat outside a project, such as one you start on the home page, Exa can list a project's sheets. Click a sheet to open it in a pane beside the chat. It has its own layout: drawing tools and the page scale on its bar, with the takeoff's items and their quantities beside the sheet. Once the project's takeoff is done, Next to check is on the bar too, and Next sheet opens the next sheet in the same pane.

When the check is done, the pane offers View bid, which opens the project's bid on the project page. When the takeoff has no bid yet, it offers Write bid, which asks this chat to write it.

Tool actions

Exa can perform actions on your behalf using built-in tools. These include creating projects, managing takeoffs and estimates, reading canvas elements, and working with spreadsheets. When you have a spreadsheet open, Spreadsheet control in the + menu lets Exa read and change it for the conversation. When Exa needs to perform an action that modifies your data, you may see an approval prompt before it executes.

The approval prompt shows what action Exa wants to take. Click Approve to let it proceed or Not now to cancel. This keeps you in control of changes to your projects.

Stopping a response

If Exa is generating a long response you no longer need, click Stop (the square button) that takes the send button's place while Exa replies. This immediately halts the response generation.

AI usage

Chat messages use your company's AI usage for the month. Longer and more complex conversations use more. To see how much of the month is used, choose Usage from the account menu, opened from your picture at the foot of the column of icons on the left edge.

A reply that has started always finishes. If this month's AI usage is used up, Exa says "This month's AI usage is used up." before the next reply. Everyone on the team sees Add extra usage. On Free, everyone sees Add extra usage and Choose a plan. See How AI usage works.

Limitations

Exa works from the content you provide and the data in your projects. It can also search the web, read a web page, and bring in plans from a share link, such as Google Drive, Dropbox, OneDrive or Box. For prices, it uses your company's own prices first; see Line items and pricing.

Questions about building codes, permits, or professional engineering matters should be verified with qualified professionals. Exa provides assistance with takeoff workflows but does not replace professional judgment.

For tips on asking questions about your plans, see Asking questions about plans. To have Exa measure your plans and calculate a weight, area, per-floor quantity or material list, see Ask the assistant to calculate it.

Did this answer your question?