The project page is everything inside a project: the bar across the top, the open sheet, and the panels beside it. This article covers the project's bar, Reports and Bids, and the sheet list. For the whole layout, including the chat, the open sheet's controls, and the item list, see Understanding the interface.
The project's bar
The project's name sits at the start of the bar. Click it to open the project menu. It holds Project settings, Pin project, Move to another organization, Archive, and Delete project, depending on your access. When the bar is narrow, the menu also holds Share.
Pin project keeps the project under Pinned at the top of the home side panel. You can pin any project in your list, and your pins are your own. Choose Unpin project to take it off. The same pin sits on the project's row in the home side panel. See Your home dashboard.
The open sheet fills the page, with the sheet list and the item list beside it. Two views open over it, and the same button or key closes each one. Alt+1 goes back to the sheet from either.
Reports (
Alt+2) shows the project's quantities. Open it with the last button in the item list's header; point at it to see its name, Reports. The item list grows to cover the sheet and shows the report. See Reports.Bids (
Alt+3) sits at the right of the bar, before Share. It is the bid's one place. It opens with the bid's Status, Due, Start, and Build months. Team members choose the status (Not submitted, Submitted, Won, or Lost) and the dates. Over the draft, Before you write lists what to settle before the bid is written, then come the project's bids, each with its own total. Each bid's row is its newest version, and older ones fold under a row such as Earlier versions · 2. Click a bid to open it.
After the project's name come the open sheet's arrows, its place in the set (such as 3/9, or 3 of 9 on a wide window), its name, and its scale; see Understanding the interface. At the right of the bar sit the people viewing the project with you, Bids, Share, and New. In a window 1024 pixels wide or wider, the item list always shows beside the sheet, so it has no button here. Team members see Share, and its icon shows who can open the project. See Sharing projects. People who can edit the project see New, which holds File upload, Folder upload, New document, New folder, Aerial survey, Measure from a photo, and Import a takeoff.
A project with no sheets
A new project is one drop zone that reads Drop your sheets here. Drop your plan files on it, or click Upload sheets. Everything else you can add is under New on the bar. See Uploading files.
The sheet list
The sheet list holds every sheet in the project, in the set's order, like a drawing index. Click the open sheet's place in the set, in the project's bar, or press Shift+L, to open it or fold it away. Point at it to see its name, Sheet list.
Each row shows the sheet's number, its name, how many marks it holds, and its revision. When something about a sheet needs you, a short line under its name says what, such as Not read or No scale. A sheet a newer version replaced reads Superseded there. When the sheet has more problems than that line says, point at the line, or press and hold it, to list them all. Click a row to open that sheet. Point at a row, or reach it with the keyboard, to show its buttons after its count of marks: its pin, if you can edit the project, then its menu button. Click the pin to pin the sheet, and click it again to unpin it. On a phone or tablet the menu button always shows, and people who can edit find Pin in that menu. A pinned sheet shows a small pin after its name, and pinned sheets sit under Pinned at the top of the list. The menu is the sheet's own menu, described in File operations.
When the set groups its sheets, the list shows each group under a heading. Click a heading to fold the group. People who can edit the project can point at a heading to open its menu: Rename…, Move to…, Merge into…, and the ways to take those back, such as Separate… and Put back where it was found.
A sheet the set's drawing index lists but you did not upload shows grayed in its place. Point at it to see Listed, not uploaded.
A sheet that prints names for its parts, such as a plan or a legend, or whose parts you named, also has a chevron. It shows with the row's other buttons, at the end of the row after the menu button. On a phone or tablet the chevron always shows, after the row's menu button. Click the chevron to list those views under the row, and click it again to fold them. Clicking the row itself still opens the sheet. The open sheet's views start folded, and the list remembers when you open them.
Finding a sheet
The top of the list holds Find a sheet, View options, and New. Type a sheet's number or name in Find a sheet to narrow the list; press G anywhere in the project to open the list with the cursor in it.
View options holds:
Group by keeps every sheet in one list. None lists the sheets in the set's order, and the others put them under headings:
File shows the same sheets under the files they came from, with your folders and documents. Folders, New folder, and Move to live here.
Type lists them under Drawings, Schedules, Legends, Notes, Specs, and Text and specs, each with its count. A sheet with a drawing on it stays under Drawings, even when it also prints a schedule or a legend; a page of text with nothing else read on it is under Text and specs.
Scale lists the sheets that need a scale first, with the rest folded below.
Sort by: Original order, Name, Sheet number, Date added, or Last edited, and the order to list them in.
Display: List or Grid.
Deleted, once a sheet is deleted, which lists the deleted sheets. The back button at the top of the list goes back to every sheet.
Inside a folder or a file, the top of the list shows a back button and where you are, with View options beside it. See Folder organization.
Tick sheets to act on several at once. The top of the list then reads, for example, 3 selected, with More, Delete, and Clear selection (Esc). More holds Rotate left, Rotate right, Read again, and Clear auto-naming. A deleted sheet goes at once, and Undo on the toast brings it back.
While files upload, their progress sits at the foot of the list, where the new sheets fill in.
The work timeline
When Exa starts a run of work on your plans, such as reading a new upload or counting your sheets, the work timeline opens over the sheet. It says Working at the top, then Done once the run is done. It shows how long the work took, then a row for each sheet with each step and What we found, and a Whole set row for work on the set as a whole. Click a row to see more, and Open the sheet to go to it.
Close it with Close. It opens by itself only once per run. To open it again, click See each sheet on Exa's takeoff card in the chat. On a phone it rises from the foot of the screen.
Search
Press Ctrl+K (Cmd+K on Mac) or /, or click the search icon on the left edge of the screen. Results from the project you are in come first, including sheets by name or sheet number. For more, see Searching files.
