Skip to main content

Editing marks

Pick marks on a sheet, then move, reshape, split, join, flip, grow, lock, or note them.

Written by Sarah Chen

A mark is one thing drawn on a sheet: an area, a run, or a count. Click a mark with Select (V) to pick it, and its actions sit on the bar at the foot of the item list. Edit (I) opens the mark's one small form, and the rest are rows of the bar's More (⋯) menu. Every change below is one step that Ctrl+Z (Cmd+Z on a Mac) takes back.

Picking marks

Click a mark to pick it, or hold Shift and click to add or take out a mark. Drag a box on empty space to pick every mark inside it. Hold Alt (Option on a Mac) and drag on the bare sheet to draw a freehand loop: every mark it touches is picked.

With a mark picked, Alt+Down and Alt+Up step through the marks of the picked mark's item. Esc lets the pick go. Tab moves on from the sheet to the rest of the page, and back onto the sheet.

The right-click menu

Right-click a picked mark for Copy, Cut, Duplicate, Remove, Bring to front, Send to back, and Copy words. Once you have copied marks, the menu also offers Paste and Paste in place, on a mark or on the bare sheet. Copy words copies the words printed on the sheet where you right-clicked, and works on the bare sheet too. If you can only view the project, the menu offers Copy and Copy words, and a visitor who is not signed in gets Copy only.

The same actions have keys: Ctrl+C, Ctrl+X, and Ctrl+V copy, cut, and paste, Ctrl+Shift+V pastes at the same place on the sheet the marks were copied from, and Ctrl+D duplicates. ] brings a mark to the front and [ sends it to the back; Alt+] and Alt+[ move it one step. On a Mac, press Cmd for Ctrl and Option for Alt. The arrow keys move picked marks, further with Shift. Delete or Backspace removes them. Cut, duplicate, select all, Delete and Backspace change marks after you click the sheet. After a click on a row of the item list, they leave the sheet alone. Click the sheet first.

Corners

Drag a picked mark's corner to move it. A small handle in the middle of each edge adds a corner there when you drag it. Shift-click several corners to light them, then drag one to move them all, or press Delete to remove them together. R redraws a picked area or run from scratch.

Reshaping a mark

Length and Grow or shrink are rows of the Edit form, and the rest are rows of the bar's More menu:

Action

What it does

Length

Sets a picked run to the length you type. The box shows the run's length as the sheet shows lengths, in feet and inches when Display is set to Feet and inches.

Continue run

Carries a run on from its end. With the run tool, a first click on either end of the picked run does the same.

Split

Draw a line across the area or run, then press Enter or Done on the bar, which reads Draw the split line: it is cut into separate marks along the line, and Esc lets go of the line with nothing cut.

Grow or shrink

Type a Distance, then move every edge of the area out or in by it.

Cut out a shape

Takes another closed mark you drew out of the area.

An area's curved edges stay curved when you join, split, grow, or shrink it.

Pick several touching areas, or runs whose ends meet, and Join in the bar's More menu makes them one mark. Flip left to right and Flip top to bottom, in the same menu, mirror the picked marks in place. They flip every kind of mark you can pick: areas, runs, counts, text, notes, arrows, highlights, clouds, traced shapes, and placed pictures, whose picture is mirrored too. A locked mark and the scale line are not flipped. A bowed arrow bows to the other side. Marks picked without an area, run, or count, such as text, notes, and arrows, have no bar: right-click them for the same two rows, as you can whenever the bar is not on screen.

Lock, show only, and draw more

Lock in the bar's More menu keeps the picked marks from being moved or reshaped by accident; Unlock frees them. A locked mark can't be picked on the sheet: click its row in the open item to pick it, then choose Unlock. An item's menu offers Lock on sheet and Unlock on sheet for all its marks. Show only this in an item's menu hides every other item's marks on the sheet until you choose Show all marks.

Draw more in the bar's More menu starts drawing more of the same item at once.

Notes and labels

Type a note in the Note row of the Edit form. It shows under the mark's name when you point at the mark on the sheet.

To see an item's name or quantity on each of its marks, set On marks on the item's page to Name or Quantity. It is Off at first. Prints show the same labels.

Did this answer your question?