Free Drywall Damage Inspector

Upload a photo of drywall damage — water stains, holes, cracks, nail pops, tape failure, or mold — and get an expert diagnosis with severity assessment, step-by-step repair instructions, a materials list, and guidance on whether to DIY or call a professional.

Love this tool? Try the full platform.

Exayard does AI-powered takeoffs, estimates, and material lists from your construction plans. Cut your takeoff time in half.