Skip to main content

Exporting takeoffs

Export your takeoff data by printing marked plans or downloading original files.

Written by Sarah Chen

Exayard provides multiple ways to export your takeoff data for use in estimates, proposals, and project documentation. You can print marked plans and download original files. To download the whole takeoff as a file, open Reports and click Export. See Reports.

Print options

Click the sheet's name in the project's bar to open its menu, then choose Print or download sheets. A dialog opens where you choose the sheets.

This sheet picks the open sheet.

Sheets with takeoffs picks only the sheets that have measurements, and shows the count. It appears when some sheets have takeoffs, but not all.

All sheets picks every sheet in your project, and shows the count, for example All sheets (12).

Current view prints only what is visible on screen. Use it for a detail area or a focused snapshot at a higher zoom.

You can also tick sheets one by one in the list. Deselect all clears the choice.

Click Print to open the sheets in a new browser window with your browser's print dialog. If nothing happens when you print, allow popups for the site.

Click Download PDF to save the chosen sheets as a PDF file, with no print dialog. The file is named after your project, followed by Marked plans. A large set is saved as several PDF files, so each one stays small enough to open on a phone. Current view prints only and has no PDF. With Current view picked, Copy picture puts what it would print on your clipboard as a picture, ready to paste into an email or a document.

Paper picks the page: Auto (your printer's own page, or Tabloid for a PDF in feet and A3 in meters), Sheet size (the sheet's own paper, when every chosen sheet has one), A4, A3, Letter, or Tabloid. Fit fills the paper, and As drawn prints the drawing at its own scale, so a ruler on the paper reads true. Every printed sheet that has a scale gets a scale bar.

Downloading files

Select Download from the sheet's menu to download the file. When a file was converted on upload (HEIC or TIFF), a submenu lets you choose between the original format and JPEG.

What each printed sheet shows

Each printed sheet shows its name, the drawing with your takeoff marks, and a legend. The legend lists each item on the sheet with its color and its quantity there. When printing, Legend places it Under the sheet or in one of its corners (Top left, Top right, Bottom left, Bottom right). When the legend does not fit, it prints on its own page after the sheet. An item set to show its name or quantity on its marks shows it on every printed sheet, not only the open one. With Sheet size, each page turns as its sheet does.

Print settings

Configure the rest in your browser's print dialog. With Auto, match the paper size there to your needs (Letter, Tabloid, A3). Set orientation to landscape for plan sheets. Enable Background graphics to include measurement fill colors, annotation colors, and plan background images.

Preparing for export

Hidden items do not appear in prints. To leave an item out, open its menu in the item list and choose Hide on sheet before you print. Show on sheet brings it back.

Saving as PDF

Set the destination in your browser's print dialog to Save as PDF to capture the export as a file rather than sending it to a printer.

Working with estimates

Takeoff data integrates with Exayard's estimating features. Your measurement data flows into estimate line items where you can add pricing and labor information to generate formatted proposals.

Did this answer your question?