Exayard provides two ways to export estimate data: reports for structured takeoff and line item summaries, and spreadsheets for custom tabular data. Both support download in multiple formats.
Exporting reports
Open Reports and pick Cost lines in the switch in the item list's header.
Click Export (the download icon) and choose a format.
Format | Best for |
Download Excel ( | Full-featured export with formatting and group headers |
Download CSV ( | Simple text format for importing into other tools |
Download PDF ( | A file ready to print or send |
The export includes all visible columns and group subtotals. Customize which columns appear using the column picker before exporting so the file contains exactly what you need. A line still waiting on a scale or a review reads Not priced in each money cell, never 0, and a note under the total says how many lines it leaves out. The Price origin column says where each price came from, and Needs pricing where a line has none.
Marked plans in the same menu saves the sheets with your takeoff drawn on them as a PDF.
Filling your own template
To fill a spreadsheet your company already uses, choose Fill my template from Export and pick an .xlsx file. Exayard finds its header row and matches each of its columns to a report column. Review the matches, choose Leave blank for any column you want empty, and click Fill and download. To keep it, tick Remember this template for and your company's name. Next time it is offered in the Export menu as Fill followed by its name.
Choosing columns
Columns in the report's View options controls which fields appear in both the on-screen table and exported files. Cost lines report columns include:
Column | Description |
Line item | Item name |
Cost type | Material, labor, equipment, subcontract, or other |
Qty | Calculated quantity from formula |
Units | Unit of measure |
Cost each | Cost per unit |
Cost total | Quantity multiplied by cost per unit |
Price total | Cost total plus markup |
Price origin | Where the price came from |
Additional columns like Takeoff, Folder, Formula, Waste %, Round up to nearest, SKU, Markup %, Markup each, Markup total, and Price each are available but hidden by default. Toggle them on for detailed exports.
Filtering before export
Narrow the report data before exporting. Use This sheet in the header to limit results to the open sheet. In View options, use Type to show only lines with a specific measurement type (area, linear, or count). The export reflects whatever is currently visible.
The grouping you select also structures the export. Grouping by trade, for example, creates a section header in the XLSX file for each trade.
Exporting spreadsheets
Spreadsheets in Exayard have their own export options. Open a spreadsheet and click the Download button in its toolbar. Choose Excel, CSV, or PDF. See Exporting.
The PDF option opens Exayard's Download PDF dialog, where you configure page setup before generating the file. The XLSX and CSV options download immediately.
Printing
To print a spreadsheet, open the Print dialog from the toolbar. Configure page setup in Exayard's dialog: paper size (letter, A4, legal, tabloid), orientation, margins, and scale. You can repeat frozen rows and columns on every page and add custom headers and footers. A live preview shows the result.
Exayard generates the PDF and opens it in a new window, where your browser's print dialog handles the final print or save.
To print a report, choose Download PDF from its Export menu and print the file.
