Skip to main content

Organization settings

Configure your organization settings and branding.

Written by Sarah Chen

Organization settings let administrators set up the company: its details, the defaults for new projects, pricing, members and billing. Every member can open most of these pages and read them. Only admins can change them, and members see "You can view these settings. Only admins can change them." Billing and usage are the exception: anyone on the team can start the company's plan, move it to a higher plan, or add extra usage once. See Subscription plans.

Accessing organization settings

Click your picture at the foot of the column of icons on the left edge of the screen and select Settings. In the sidebar, your organization's name heads its settings, below your personal settings: Organization, Pricing, Members, Properties, Measurement rules, Billing, Usage, Widget and Developer. If you belong to more than one organization, switch to the one you want first from the account menu.

Organization

The Organization page holds your company's details and defaults. Changes save automatically.

Organization details

Click Upload logo to add your logo, or Replace or Remove to change it. Edit the Organization name field to rename the company.

Bid details

These are shown on your bids and shared documents: Brand color, Website, Business address, Business phone and Business email.

Project defaults

Trades lists your company's trades or specialties, such as electrical, plumbing, or concrete. Select one or more from the list. Measurement system sets Imperial or Metric for new projects, and for projects that have no system of their own. A project with its own system keeps it, and each project can change it in its project settings.

Team channel

Team channel posts to a Slack or Microsoft Teams channel when takeoffs finish and clients act on bids. Click Connect Slack or Connect Microsoft Teams, choose a Channel, then pick what to post under Post when: Takeoff finished, Bid viewed, New bid comment and Bid accepted. Click Disconnect to stop posting.

Pricing

The Pricing page sets where your prices come from and how bids are priced.

  • Where prices come from: the Pricing location for your local labor, material and equipment rates, the Currency used for your projects, bids and prices, and Use my own prices first, which puts your catalogs, labor rates and price lists ahead of the published price book. See Your price list.

  • Estimating defaults and On your bids: markup, margin and tax for each cost type, and what your bids show. See Markup and tax.

  • Your pricing terms: Labor burden and Material waste, as percentages.

Other pages

Did this answer your question?