File operations let you manage construction documents after upload. Each sheet has one menu. Open it from the sheet's name in the project's bar, or from the menu button that shows when you point at the sheet's row in the sheet list (on a phone or tablet it always shows). Files, folders, and documents in the list have the same menu button.
What the menu holds
Row | What it does |
Download | Saves the sheet or file to your computer |
The sheet's versions | Lists every upload of the sheet, when it has more than one |
Print or download sheets | Prints or downloads this sheet or several |
History | This sheet shows the sheet's earlier states, and Takeoff opens the takeoff's history |
Pin | Keeps the sheet or document under Pinned at the top of the sheet list |
Rename… | Changes the name, and for a sheet its sheet number |
Select | Starts picking several rows in the sheet list |
Duplicate | Copies a file with all its sheets |
Upload new version… | Adds a newer version of the sheet or file |
Move to | Moves a file, folder, or document into a folder |
Delete | Moves the item to Deleted |
Rows past History show only to people who can edit the project.
Renaming
Open the menu and select Rename to change an item's name. Press Enter or click Save to confirm. For sheets, you can also edit the Sheet number (like A1.01). Sheet names and sheet numbers appear in your takeoff reports and exports, so keep them accurate.
Pinning
Select Pin to keep a sheet at the top of the sheet list, under Pinned. In the list you can also point at a row and click its pin. Select Unpin to take it off.
Moving
Open the menu on a file, folder, or document and select Move to, then pick a folder, or Home for the top of the project. To move several items at once, use the selection bar described under bulk operations.
Downloading
Open the menu and select Download to save the item to your computer. For files that were converted during upload (HEIC or TIFF images), a submenu lets you choose between the original format or the converted JPEG.
Sheets that stand for several copies
A set can draw something once and title the sheet for every identical copy it stands for, as a range or a list. Ask Exa to set the number of copies when the sheet title prints the range or list.
Totals, reports, exports, estimates, and bids multiply that sheet's quantities by the number. The one-copy figure stays visible with the multiplier beside it, like x 14. AI usage is not multiplied: the sheet is measured once and uses AI usage once.
Bulk operations
Choose Select in a row's menu to start picking. A box shows on each row: tick the ones you want, or hold Shift and click to pick a range. While rows are picked, the top of the sheet list shows how many are selected, such as 1 selected, with the actions for them:
More holds Move to for files and folders, then for sheets Rotate left, Rotate right, Read again, and Clear auto-naming.
Delete moves the picked items to Deleted at once, with Undo on the toast.
Click Clear selection (Esc) at the end of that bar to end the picking.
Deleting and recovering
Open the menu on an item and select Delete to remove it. A deleted sheet goes at once, and Undo on the toast brings it back. Later, open View options at the top of the sheet list and select Deleted; for deleted files and folders, first set Group by to File in the same menu. Open the menu on the item and select Restore.
