Exayard provides several ways to organize your estimates: folders for grouping takeoff symbols, collections (template packs) for grouping reusable templates, and cost types on every line item. Together, these keep large projects manageable.
Folders
Folders group takeoff symbols within a project. When a project has folders, open the item's menu in the open item, choose Move to group, and pick a folder. Folders support nesting, so you can have a hierarchy like Site Work > Hardscape > Pavers.
Folders carry through to the reports view: turn on the Folder column in the Cost lines report to see each line's folder.
Collections
Collections (also called template packs) are groups of takeoff symbol templates stored at the organization level. Each collection has a name and color, and contains reusable symbol templates with pre-configured line items.
On the Templates page, the Template pack dropdown filters the grid to one collection. Select All templates to see everything, or pick a collection to focus on one scope area. Create a new collection with the New template pack option in the dropdown.
Cost types
An item's cost lines form one list, in cost type order: Material, Labor, Equipment, Subcontract, and Other. Each line shows its type under its name, and the item's cost sits once at the head of the list.
Open Add line and choose Ask Exa to suggest to have the AI assistant suggest lines, which land in the right place in the list. To add a line manually, open Add line, choose Blank line, and pick its cost type.
Drag a line to reorder it among the lines of its type. You cannot drag a line past another type, since each line's type determines where it belongs. A line's cost type is fixed there; to change the type of a template's line, edit the Type column on the Templates page.
Grouping in reports
In Reports, the Cost lines report lists every line. In View options, Group by shows them with No grouping, by Trade, or by one of your organization's custom properties, such as a cost code. Each group shows a summary row with total cost and total price. See Reports.
Type filtering
The Templates page toolbar includes a Type filter. Click it to show only line items of a specific cost type. This is useful when you want to review all material costs or all labor costs across every symbol in the project.
Combine the collection filter with the type filter to narrow the view further. For example, pick a collection and the Material type to see only that collection's material line items.
