Construction takeoff & estimating
Run construction takeoffs and estimates from ChatGPT
Install the Exayard custom GPT and ChatGPT can run takeoffs, pull live vendor pricing, and draft bids across your construction projects — just by asking in plain English. No code required.
What is ChatGPT?
ChatGPT is OpenAI's AI assistant. The Exayard custom GPT adds Exayard's tools to ChatGPT, so it can run takeoffs, price materials, generate estimates, and draft bids on your construction projects — no code or configuration required.
Built for autonomous estimating
Exayard exposes every takeoff, pricing, and bid action as a tool ChatGPT can call, so it does the work you would normally click through by hand.
Estimate in plain English
Describe the outcome and ChatGPT drives Exayard for you — no clicking through screens, no glue code.
Real catalog and vendor pricing
ChatGPT searches your product catalog and live vendor prices, so every estimate is built on real numbers.
Takeoff to bid in one request
Chain detection, approval, estimating, and bid generation into a single turn instead of an afternoon of work.
What you can do with ChatGPT
Once ChatGPT is connected, you can drive Exayard with plain-language prompts.
Install in 60 seconds
Four short steps to wire ChatGPT to your Exayard projects.
Open the Exayard GPT
In ChatGPT, search the GPT store for "Exayard" or open the direct link from your Exayard developer settings. The Exayard GPT requires ChatGPT Plus, Team, or Enterprise.
Authorize Exayard
On first use the GPT opens an OAuth consent screen. Sign in to your Exayard account and approve the scopes it requests — there are no API keys to paste.
Ask in plain English
Try one of the example prompts below. The GPT calls Exayard and returns structured results you can act on.
Example prompts
Drop any of these into ChatGPT after connecting.
You
Create a project named "Maple Heights renovation" and upload my plan PDFs.
You
Run a takeoff on page 3 of the Smith Residence plans and show me the proposed receptacle count.
You
Generate a bid from the approved Smith Residence takeoff, with a 15% markup.
You
Search the product catalog for 12-gauge copper wire and show me the cheapest vendor.
You
Compare estimated cost vs. last quarter for projects tagged "kitchen remodel".
Built-in workflows
Exayard ships MCP slash-commands so ChatGPT can run end-to-end workflows in a single turn.
/takeoff_from_plans
Run a takeoff end-to-end on uploaded plans.
/generate_bid_from_takeoff
Price an approved takeoff and emit a bid document.
/review_estimate_line_items
Audit an existing estimate for outliers and missing prices.
/create_project_from_upload
Scaffold a project and attach files from a chat upload.
Keep a human in the loop
Destructive tools (archive, remove, cancel, approve) are gated behind a propose_destructive_action step that surfaces in ChatGPT and waits for your explicit confirmation before running.
Long-running calls like create_estimate and create_bid take 30–60 seconds — ChatGPT will warn you before invoking them.
Frequently asked questions
Works with your whole agent stack
Exayard speaks MCP, so it drops into every major AI agent and editor.
Ready to win more bids?
Use Exayard to estimate faster and win more work. Get started today.