Siding Estimating in Half the Time

AI-powered takeoffs and estimates.

Trusted by leading siding contractors

Greenscape Designs
Stone & Bloom
Terra Verde
Precision Landscapes
Oak & Ivy
Summit Outdoor Living
Verdant Pro
Heritage Lawn & Garden
Canopy Creations
BlueStone Exteriors
Greenscape Designs
Stone & Bloom
Terra Verde
Precision Landscapes
Oak & Ivy
Summit Outdoor Living
Verdant Pro
Heritage Lawn & Garden
Canopy Creations
BlueStone Exteriors

Everything you need for faster siding estimates

AI tools designed for siding and exterior contractors. Measure elevations, count panels, and quantify trim automatically.

Elevation Area

Calculate exterior wall areas from elevation drawings. Window and door openings deducted automatically.

Panel & Sheet Count

Convert square footage to panel counts for vinyl, fiber cement, metal, and engineered wood products.

Trim & Accessories

Measure linear feet of J-channel, corner posts, starter strip, soffit, and fascia from elevations.

Material Lists

Export panel counts, trim quantities, and accessory lists to Excel or PDF for ordering.

How it works

From elevation to estimate in minutes. See how Exayard transforms siding estimation.

1

Upload Your Plans

Drag and drop PDF, image, or CAD files. Exayard handles any format—architectural, landscape, MEP, structural—with automatic scale detection.

2

Describe What You Need

Describe what you need like you would to a colleague. "Count all outlets," "Measure turf area," or "Find HVAC diffusers."

3

Export & Win

Review AI results, apply your pricing, and export professional estimates. Excel, PDF, or direct integrations—ready to send.

0%

Faster takeoffs

0x

More bids submitted

0%

Revenue increase

Loved by siding professionals

See what siding and exterior contractors say about transforming their estimation process.

We used to spend a full day measuring elevations by hand. Exayard gives us panel counts and trim lengths in minutes.
Travis Holt
Travis Holt
Owner, Holt Exteriors
The opening deductions are spot on. No more overordering siding because we guessed wrong on window sizes.
Sandra Reeves
Sandra Reeves
Lead Estimator, Pinnacle Siding & Trim
We handle vinyl, fiber cement, and metal panels. Exayard keeps our estimates consistent across all product lines.
Marcus Lowe
Marcus Lowe
Operations Manager, AllClad Exteriors
Included for free

Your siding AI agent for

capturing leads.

Add an AI agent to your website that shows homeowners what new siding would look like, provides instant estimates, and captures every lead — even on weekends.

AI Agent

On your website

Ask a question...

What is siding and exterior estimating software?

Siding and exterior takeoff software automates the measurement of wall cladding areas, trim lengths, and accessory quantities from building elevations and floor plans. Siding contractors use it to calculate square footage of lap siding, board and batten, fiber cement panels, or other cladding materials while deducting windows, doors, and other openings. It also measures soffit, fascia, corner trim, J-channel, and starter strips — the linear components that often represent a significant portion of material cost. For multi-elevation projects, manual measurement from printed plans is slow and error-prone, especially when accounting for gable ends and varying wall heights.

AI-powered exterior takeoff software like Exayard reads building elevations to automatically calculate net wall areas by material type, deducting openings and applying waste factors. It traces trim runs along corners, window and door casings, rake edges, and water tables, generating linear footage by profile. The AI also identifies soffit areas under overhangs and fascia runs along eave lines. This means estimators no longer need to manually scale each elevation and subtract openings one by one. Teams using AI-assisted siding takeoffs complete exterior material estimates in a fraction of the traditional time, with fewer missed trim pieces and more accurate material orders.

Why siding contractors choose AI estimating

Net wall areas, trim quantities, and complete material lists from elevations.

Net wall area calculation

Measure cladding areas with automatic window and door deductions across all building elevations.

Trim length measurement

Trace corner boards, window trim, rake trim, and water table runs for accurate linear ordering.

Soffit and fascia quantities

Calculate soffit square footage and fascia linear feet from overhang details and eave lines.

Material type separation

Track different cladding materials — lap siding, panels, stone veneer — as separate quantity groups.

Opening deductions

Automatically deduct windows, doors, and louvers from gross wall areas with appropriate waste factors.

Elevation-by-elevation breakdown

Organize quantities by building face for crew scheduling and staged material delivery.

Frequently asked questions

Everything you need to know about siding takeoff software.

Ready to win more siding bids?

Join siding contractors using Exayard to estimate faster and more accurately.