
Your flooring AI agent for
Add an AI agent to your website that helps homeowners choose between hardwood, tile, carpet, and LVP, provides instant flooring estimates, and captures every lead.
AI Agent
On your website
Turn website visitors into flooring leads
An AI agent built for flooring contractors. Compare materials, estimate projects, and capture leads around the clock.
AI material guidance
The agent explains the differences between hardwood, LVP, tile, carpet, and laminate — durability, cost, maintenance, and best uses — so visitors feel confident before they call.
Instant flooring estimates
Your AI provides per-square-foot pricing for different flooring options based on your rates, including installation, underlayment, and removal of existing floors.
Estimate summary
Based on your rates
AI room visualization
Homeowners upload a photo of their room and see AI-generated previews with different flooring options — helping them pick a product and commit to the project.
Automatic lead capture
Every conversation captures contact info, room dimensions, preferred materials, and budget. Leads arrive in Exayard with full project context.
New lead captured
One AI agent, three ways to grow your business
Your AI agent does more than answer questions — it actively drives revenue.
Lead capture
Turn every website visitor into a potential customer. The AI collects contact info, project details, and photos through natural conversation.
Customer support
Answer common questions 24/7 — service areas, pricing ranges, scheduling. Without lifting a finger.
Sales qualification
Know the project type, timeline, and budget before your first call. The AI qualifies leads so you focus on the right ones.
Your website is losing leads right now
Most contractor websites have a contact form and an email address. Here's what happens when you add Exayard.
| Capability | Your website today | With Exayard |
|---|---|---|
| After-hours visitors | See a contact form, leave | Get instant answers and become leads at 2 AM |
| Pricing questions | "Call us for a quote" | Ballpark estimates from your actual rates, instantly |
| Lead information | Name and email from a form | Project scope, photos, budget, and contact info |
| Industry knowledge | None | Understands your trade terminology, services, and project types |
| Visual previews | Not possible | AI-generated previews of the finished project |
How it works
Go from install to lead capture in three simple steps. No technical skills required.
Set up your agent
Configure your services, set your brand colors, and customize the chat experience — all from your dashboard.
Add to your website
Copy one line of code into your site, or use our WordPress, Squarespace, Wix, or Shopify plugin. Takes under five minutes.
Start capturing leads
Visitors chat with your AI agent, get estimates, and share their contact info — all while you're working.
Your data is safe with us
Security and privacy are built into every layer of Exayard.
Encrypted conversations
All chat conversations are encrypted in transit and at rest.
Your data stays yours
Your business data and customer conversations are never used to train AI models.
Full data control
Export or delete your data at any time. Your leads, your conversations, your business.
Install in minutes on any platform
One-click plugins for the most popular website builders, or a single script tag for everything else.
Built for your trade
Select your industry to see how Exayard works for you
0
Languages your agent can speak
0/7
Lead capture, even at 2 AM
< 0 sec
Average visitor response time
Frequently asked questions
Everything you need to know about the Exayard AI agent for flooring contractors.
Stop losing leads from your website
Flooring contractors using Exayard capture leads 24/7 with AI-powered material guidance and instant estimates. Set up in 5 minutes.