
Drywall Estimating in Half the Time
AI-powered takeoffs and estimates.
No credit card required
Trusted by leading drywall contractors
Everything you need for faster drywall estimates
AI tools designed for drywall contractors. Measure walls, ceilings, and openings automatically.
Auto Wall Area
Calculate wall and ceiling areas instantly. Square footage measured in seconds, not hours.
Linear Footage
Automatically measure corner beads, trim, and linear footage for accurate material counts.
Opening Detection
AI identifies doors, windows, and openings to subtract from wall areas automatically.
Material Lists
Export complete board counts, tape, mud, and fastener requirements to Excel or PDF.
How it works
From blueprint to bid in minutes. See how Exayard transforms drywall estimation.
Upload Your Plans
Drag and drop PDF or image files. Exayard handles any format—architectural, landscape, MEP, structural—with automatic scale detection.
Describe What You Need
Describe what you need like you would to a colleague. "Count all outlets," "Measure turf area," or "Find HVAC diffusers."
Export & Win
Review AI results, apply your pricing, and export professional estimates. Excel, PDF, or direct integrations—ready to send.
0%
Faster takeoffs
0x
More bids submitted
0%
Revenue increase
Loved by drywall professionals
See what drywall contractors say about transforming their estimation process.
“Exayard cut our drywall estimating time in half. We bid on twice as many jobs now.”

“The accuracy is incredible. No more second-guessing our board counts or material quantities.”

“We increased our revenue by 35% in the first year. The ROI on Exayard was immediate.”

Your drywall AI agent for
Add an AI agent to your website that qualifies drywall projects, provides square footage estimates, and captures every lead — from basement finishes to commercial buildouts.
No credit card required
AI Agent
On your website
What is drywall estimating software?
Drywall takeoff software helps drywall and interior finishing contractors estimate material quantities from architectural floor plans and partition schedules. Estimators use it to calculate wall and ceiling square footage, determine board counts by size and type, measure linear footage for corner bead and trim, and quantify accessories like joint compound, tape, and fasteners. For drywall contractors bidding commercial tenant improvements or multi-family residential projects, accurate area calculations directly control material costs and labor estimates. Manual drywall takeoffs — measuring each wall segment, subtracting openings, and tallying board counts — are time-consuming and prone to errors on large projects with dozens of partition types.
AI-powered drywall takeoff software automates wall and ceiling measurement by reading floor plans, identifying partition types from wall schedules, and calculating areas with opening deductions built in. Exayard measures every wall segment on a floor plan simultaneously, matches wall types to their assembly specifications (single-layer, double-layer, fire-rated), and computes board counts with your preferred waste factors. A commercial floor that takes an estimator 3 to 4 hours to measure manually can be completed in about 30 minutes. This speed advantage lets drywall contractors bid on more projects each week while maintaining the measurement accuracy their pricing depends on.
Why drywall contractors choose AI estimating
Accurate board counts, less waste, and more competitive bids.
Wall areas auto-calculated
Every wall segment measured and totaled by partition type with opening deductions applied.
Board counts by type
Sheet quantities calculated for standard, moisture-resistant, fire-rated, and abuse-resistant boards.
Ceiling areas included
Flat and suspended ceiling drywall areas measured from reflected ceiling plans automatically.
Accessories quantified
Joint compound, tape, screws, and corner bead calculated based on actual wall and ceiling areas.
Assembly types matched
Wall types linked to partition schedules for correct layer counts and board specifications.
Bid more work monthly
Complete floor takeoffs in 30 minutes instead of 3-4 hours of manual wall measurement.
Frequently asked questions
Everything you need to know about drywall takeoff software.
Resources
Explore more ways to streamline your estimating workflow.
Blog
Tips, guides, and industry insights for construction professionals.
Compare
See how Exayard stacks up against other takeoff and estimating tools.
Free Tools
Free AI-powered calculators, generators, and lookup tools for your trade.
ROI Calculator
Calculate how much time and money AI estimating can save your team.
Ready to win more drywall bids?
Join drywall contractors using Exayard to estimate faster and more accurately.