
Everything you need for faster tile estimates
AI tools designed for tile and stone contractors. Measure areas, calculate waste, and match finish schedules automatically.
Auto Area Calculation
Calculate floor tile, wall tile, and backsplash areas instantly. Square footage measured in seconds, not hours.
Pattern & Waste
Account for tile patterns like herringbone, running bond, and diagonal layouts with accurate waste factors built in.
Finish Schedule Matching
AI reads finish schedules to match tile types to rooms, tracking sizes, colors, and materials across your plans.
Material Lists
Export complete tile quantities, thinset coverage, grout needs, and backer board requirements to Excel or PDF.
How it works
From blueprint to bid in minutes. See how Exayard transforms tile and stone estimation.
Upload Your Plans
Drag and drop PDF, image, or CAD files. Exayard handles any format—architectural, landscape, MEP, structural—with automatic scale detection.
Describe What You Need
Describe what you need like you would to a colleague. "Count all outlets," "Measure turf area," or "Find HVAC diffusers."
Export & Win
Review AI results, apply your pricing, and export professional estimates. Excel, PDF, or direct integrations—ready to send.
Your tile & stone AI agent for
Add an AI agent to your website that quotes tile and stone projects, recommends materials, and captures every lead — from bathroom remodels to commercial lobbies.
AI Agent
On your website
What is tile and stone estimating software?
Tile and stone takeoff software automates the measurement of floor areas, wall areas, and accent zones where tile, natural stone, or engineered stone will be installed. Tile contractors and flooring estimators use it to calculate quantities by material type, accounting for different tile sizes, patterns, and layout areas shown on finish plans. Beyond area measurement, accurate tile estimation requires quantifying grout, thin-set, backer board, waterproofing membrane, edge trim, and transition strips. Manual takeoff from finish plans is slow because rooms often have multiple tile types, and wall tile areas require measuring from elevation drawings rather than floor plans.
AI-powered tile and stone takeoff software like Exayard reads finish schedules and floor plans to automatically identify tile zones by material type, calculate areas, and apply waste factors appropriate to the tile size and pattern. The AI also measures wall tile areas from interior elevations, counts accent band linear footage, and identifies trim pieces like bullnose, Schluter strips, and thresholds. This automates the manual process of cross-referencing finish schedules with room-by-room floor plan measurements. Tile contractors using AI-assisted takeoffs complete material estimates significantly faster, with fewer errors from misread finish tags or missed accent areas.
Why tile contractors choose AI estimating
Accurate area calculations, finish schedule matching, and complete material lists.
Area by material type
Calculate floor and wall tile areas separated by material, size, and finish from plan schedules.
Finish schedule matching
Cross-reference room finish tags with tile schedules for automatic material type assignment.
Waste factor application
Apply appropriate waste percentages based on tile size, pattern complexity, and room shape.
Trim and edge quantities
Measure bullnose, Schluter, thresholds, and transition strips at material change locations.
Wall tile from elevations
Measure shower surrounds, backsplashes, and accent walls from interior elevation drawings.
Setting material calculation
Calculate thin-set, grout, backer board, and membrane quantities based on tile area and specifications.
Frequently asked questions
Everything you need to know about tile and stone takeoff software.
Resources
Explore more ways to streamline your estimating workflow.
Ready to win more tile bids?
Join tile and stone contractors using Exayard to estimate faster and more accurately.