Flooring Estimating in Half the Time

AI-powered takeoffs and estimates.

Everything you need for faster flooring estimates

AI tools designed for flooring contractors. Measure floor areas, calculate waste, and count transitions automatically.

Auto Floor Area

Calculate room-by-room square footage instantly. Hardwood, tile, carpet, and LVP areas measured in seconds, not hours.

Waste Factor Calculation

Apply custom waste percentages by material type — diagonal tile layouts, patterned carpet, or standard LVP with automatic box rounding.

Transition Strips

Automatically measure linear footage for T-molding, reducers, thresholds, and edge trim where flooring types change.

Material Lists

Export complete material orders — square footage by product, underlayment, adhesive, transitions, and trim — to Excel or PDF.

How it works

From blueprint to bid in minutes. See how Exayard transforms flooring estimation.

1

Upload Your Plans

Drag and drop PDF, image, or CAD files. Exayard handles any format—architectural, landscape, MEP, structural—with automatic scale detection.

2

Describe What You Need

Describe what you need like you would to a colleague. "Count all outlets," "Measure turf area," or "Find HVAC diffusers."

3

Export & Win

Review AI results, apply your pricing, and export professional estimates. Excel, PDF, or direct integrations—ready to send.

AI Agent

On your website

Ask a question...

What is flooring estimating software?

Flooring takeoff software helps flooring contractors measure floor areas by material type, calculate waste factors, and count transition strips and accessories from architectural floor plans and finish schedules. Whether you install carpet, LVP, hardwood, tile, epoxy, or polished concrete, accurate area measurement is the foundation of every flooring bid. Manual takeoff means scaling rooms one at a time, referencing finish schedules to determine which material goes where, and applying waste percentages based on room geometry. On a commercial project with dozens of unique floor finishes, this process can take an entire day and still leave room for measurement errors.

AI-powered flooring takeoff software like Exayard reads finish schedules and floor plans together, automatically associating each room with its specified flooring material and measuring the area. Instead of tracing room boundaries manually, the AI identifies enclosed spaces and calculates net floor areas — subtracting columns, casework, and other obstructions where specified. It applies material-specific waste factors and generates order quantities by material type. For flooring contractors, Exayard reduces a full-day takeoff to about an hour, with fewer measurement errors and a clear breakdown of square footage by material that is ready for supplier pricing.

Why flooring contractors choose AI estimating

Measure every room, apply every waste factor, bid with confidence.

Area by material type

Automatically group floor areas by carpet, tile, LVP, hardwood, or any finish specified in the schedule.

Built-in waste factors

Apply material-specific waste percentages to get accurate order quantities, not just net floor areas.

Transition strip counts

Identify and measure material transitions to calculate reducer, T-bar, and threshold quantities.

Schedule cross-reference

AI reads finish schedules to assign the correct flooring material to each room automatically.

Obstruction deductions

Subtract columns, built-in casework, and island footprints from room areas for net measurements.

Supplier-ready quantities

Export square footage by material with waste included, formatted for supplier quotes and purchase orders.

Frequently asked questions

Everything you need to know about flooring takeoff software.

Ready to win more flooring bids?

Join flooring contractors using Exayard to estimate faster and more accurately.