Your paving AI agent for

capturing leads.

Add an AI agent to your website that qualifies paving projects, provides instant estimates for driveways and parking lots, and captures every lead — even after hours.

AI Agent

On your website

Ask a question...

Turn website visitors into paving leads

An AI agent built for paving contractors. Qualify projects, estimate jobs, and capture leads from every visitor.

AI project qualification

The agent asks about surface type, area size, and current condition — so you only follow up on projects that match your capabilities and minimums.

How much would a new patio cost?
Based on your yard size, a paver patio typically runs $3,200–$4,800. Want to see a preview?
Yes, show me!

Instant paving estimates

Your AI provides ballpark pricing for driveways, parking lots, sealcoating, and patching based on your square footage rates and material costs.

Estimate summary

Based on your rates

Patio installation$3,200 – $4,800
Landscape lighting$800 – $1,200
Sod and grading$1,500 – $2,100
Estimated total$5,500 – $8,100

AI surface visualization

Property owners upload a photo of their cracked driveway or worn lot and see AI-generated previews of fresh asphalt, stamped concrete, or paver options.

Your photo
AI
AI preview

Automatic lead capture

Every conversation captures contact info, surface area, project type, and timeline. Leads arrive in Exayard ready for follow-up.

New lead captured

NameSarah Mitchell
Emailsarah@email.com
Phone(555) 123-4567
ProjectBackyard patio + lighting
Budget$5,000 – $8,000

One AI agent, three ways to grow your business

Your AI agent does more than answer questions — it actively drives revenue.

Lead capture

Turn every website visitor into a potential customer. The AI collects contact info, project details, and photos through natural conversation.

Customer support

Answer common questions 24/7 — service areas, pricing ranges, scheduling. Without lifting a finger.

Sales qualification

Know the project type, timeline, and budget before your first call. The AI qualifies leads so you focus on the right ones.

Your website is losing leads right now

Most contractor websites have a contact form and an email address. Here's what happens when you add Exayard.

CapabilityYour website todayWith Exayard
After-hours visitors
See a contact form, leave
Get instant answers and become leads at 2 AM
Pricing questions
"Call us for a quote"
Ballpark estimates from your actual rates, instantly
Lead information
Name and email from a form
Project scope, photos, budget, and contact info
Industry knowledge
None
Understands your trade terminology, services, and project types
Visual previews
Not possible
AI-generated previews of the finished project

How it works

Go from install to lead capture in three simple steps. No technical skills required.

1

Set up your agent

Configure your services, set your brand colors, and customize the chat experience — all from your dashboard.

2

Add to your website

Copy one line of code into your site, or use our WordPress, Squarespace, Wix, or Shopify plugin. Takes under five minutes.

3

Start capturing leads

Visitors chat with your AI agent, get estimates, and share their contact info — all while you're working.

Your data is safe with us

Security and privacy are built into every layer of Exayard.

Encrypted conversations

All chat conversations are encrypted in transit and at rest.

Your data stays yours

Your business data and customer conversations are never used to train AI models.

Full data control

Export or delete your data at any time. Your leads, your conversations, your business.

Install in minutes on any platform

One-click plugins for the most popular website builders, or a single script tag for everything else.

WordPress
Squarespace
Wix
Shopify
Any website

0

Languages your agent can speak

0/7

Lead capture, even at 2 AM

< 0 sec

Average visitor response time

Frequently asked questions

Everything you need to know about the Exayard AI agent for paving contractors.

Stop losing leads from your website

Paving contractors using Exayard capture leads 24/7 with AI-powered project qualification and instant estimates. Set up in 5 minutes.