
Your siding AI agent for
Add an AI agent to your website that shows homeowners what new siding would look like, provides instant estimates, and captures every lead — even on weekends.
AI Agent
On your website
Turn website visitors into siding leads
An AI agent built for siding and exterior contractors. Visualize options, estimate projects, and capture leads around the clock.
AI exterior visualization
Homeowners upload a photo of their home and see AI-generated previews with different siding materials, colors, and profiles — making it easy to commit to a project.
Instant siding estimates
Your AI provides ballpark pricing for vinyl, fiber cement, metal panels, and trim work based on your rates and typical home sizes.
Estimate summary
Based on your rates
AI-powered conversations
The agent understands siding materials, R-values, wind ratings, and maintenance differences. It answers visitor questions like a knowledgeable sales rep.
Automatic lead capture
Every conversation captures contact info, home dimensions, material preferences, and photos. Leads flow into Exayard ready for follow-up.
New lead captured
One AI agent, three ways to grow your business
Your AI agent does more than answer questions — it actively drives revenue.
Lead capture
Turn every website visitor into a potential customer. The AI collects contact info, project details, and photos through natural conversation.
Customer support
Answer common questions 24/7 — service areas, pricing ranges, scheduling. Without lifting a finger.
Sales qualification
Know the project type, timeline, and budget before your first call. The AI qualifies leads so you focus on the right ones.
Your website is losing leads right now
Most contractor websites have a contact form and an email address. Here's what happens when you add Exayard.
| Capability | Your website today | With Exayard |
|---|---|---|
| After-hours visitors | See a contact form, leave | Get instant answers and become leads at 2 AM |
| Pricing questions | "Call us for a quote" | Ballpark estimates from your actual rates, instantly |
| Lead information | Name and email from a form | Project scope, photos, budget, and contact info |
| Industry knowledge | None | Understands your trade terminology, services, and project types |
| Visual previews | Not possible | AI-generated previews of the finished project |
How it works
Go from install to lead capture in three simple steps. No technical skills required.
Set up your agent
Configure your services, set your brand colors, and customize the chat experience — all from your dashboard.
Add to your website
Copy one line of code into your site, or use our WordPress, Squarespace, Wix, or Shopify plugin. Takes under five minutes.
Start capturing leads
Visitors chat with your AI agent, get estimates, and share their contact info — all while you're working.
Your data is safe with us
Security and privacy are built into every layer of Exayard.
Encrypted conversations
All chat conversations are encrypted in transit and at rest.
Your data stays yours
Your business data and customer conversations are never used to train AI models.
Full data control
Export or delete your data at any time. Your leads, your conversations, your business.
Install in minutes on any platform
One-click plugins for the most popular website builders, or a single script tag for everything else.
Built for your trade
Select your industry to see how Exayard works for you
0
Languages your agent can speak
0/7
Lead capture, even at 2 AM
< 0 sec
Average visitor response time
Frequently asked questions
Everything you need to know about the Exayard AI agent for siding contractors.
Stop losing leads from your website
Siding contractors using Exayard capture leads 24/7 with AI exterior visualization and instant estimates. Set up in 5 minutes.