Fire Protection Estimating in Half the Time

AI-powered takeoffs and estimates.

Everything you need for faster fire protection estimates

AI tools designed for fire protection contractors. Count heads, measure pipe runs, and read riser diagrams automatically.

Sprinkler Head Counting

Instantly count pendant, upright, sidewall, and concealed heads by type and coverage area across all sheets.

Pipe Run Measurement

Measure branch lines, cross mains, and feed mains automatically. Footage calculated by pipe diameter and system type.

Device Recognition

AI identifies fire alarm devices, pull stations, smoke detectors, strobes, and notification appliances from your plans.

Material Lists

Export head counts, pipe quantities, fitting lists, and hanger requirements to Excel or your estimating software.

How it works

From blueprint to bid in minutes. See how Exayard transforms fire protection estimation.

1

Upload Your Plans

Drag and drop PDF, image, or CAD files. Exayard handles any format—architectural, landscape, MEP, structural—with automatic scale detection.

2

Describe What You Need

Describe what you need like you would to a colleague. "Count all outlets," "Measure turf area," or "Find HVAC diffusers."

3

Export & Win

Review AI results, apply your pricing, and export professional estimates. Excel, PDF, or direct integrations—ready to send.

AI Agent

On your website

Ask a question...

What is fire protection estimating software?

Fire protection takeoff software helps sprinkler contractors and fire alarm installers quantify materials from fire protection drawings. This includes counting sprinkler heads by type, measuring pipe runs and risers, tallying alarm devices like pull stations, smoke detectors, and horn strobes, and extracting equipment specs from riser diagrams. Fire protection takeoffs demand precision — a missed sprinkler head or incorrect pipe size can trigger code violations, failed inspections, and expensive rework. Manual takeoffs involve counting hundreds or thousands of device symbols across multiple floor plans while tracking different head types, temperature ratings, and coverage areas.

AI-powered fire protection takeoff software like Exayard automates the most tedious part of this work: counting and categorizing every device on every sheet. The AI recognizes sprinkler head symbols — distinguishing between pendant, upright, sidewall, and concealed types — and counts them per zone or floor. It traces branch line and main runs to calculate pipe lengths, and identifies riser locations from riser diagrams. For fire protection contractors who bid competitively, the speed advantage is significant: what used to take a full day of counting can be completed in under an hour, with fewer missed devices and a clear visual record of what was counted.

Why fire protection contractors choose AI estimating

Count every head, measure every run, catch every device.

Sprinkler head counting

Count hundreds of heads per floor in seconds, automatically categorized by type and orientation.

Pipe run measurement

Trace branch lines, cross mains, and feed mains to calculate total pipe lengths by diameter.

Alarm device tallies

Count pull stations, smoke detectors, heat detectors, and notification appliances across all sheets.

Riser diagram reading

Extract riser locations, floor connections, and system zoning from fire protection riser diagrams.

Zone-based organization

Group device counts and pipe quantities by zone, floor, or system for organized material ordering.

Code-confidence bidding

Reduce the risk of missed devices that lead to failed inspections and costly post-install additions.

Frequently asked questions

Everything you need to know about fire protection takeoff software.

Ready to win more fire protection bids?

Join fire protection contractors using Exayard to estimate faster and more accurately.