Free AI tools for construction
AI-powered bid proposals, code lookups, calculators, and document generators — built for your trade. No signup required.
Try Exayard FreeDrywall
AI Bid Proposal Writer
Generate professional drywall bid proposals in seconds.
Fire-Rating Assembly Finder
Find the right UL fire-rated assembly for your project.
Change Order Letter Writer
Write professional change order letters in minutes.
Scope Gap Analyzer
Find missing items and risks in drywall scopes of work.
Drywall Material Calculator
Calculate drywall materials for any project instantly.
Drywall Damage Inspector
Upload a photo of damaged drywall and get a repair plan.
Electrical
AI Bid Proposal Writer
Generate professional electrical bid proposals in seconds.
NEC Code Q&A
Get instant answers to NEC code questions with article references.
Panel Schedule Builder
Build formatted panel schedules with load calculations.
Wire Size Calculator
Calculate wire and conduit sizes per NEC with voltage drop.
Electrical Scope Reviewer
Find missing items and risks in electrical scopes of work.
Panel Schedule Digitizer
Upload a photo of your panel directory and get a clean digital schedule.
Furniture, Fixtures & Equipment
AI Bid Proposal Writer
Generate professional FF&E bid proposals in seconds.
FF&E Budget Generator
Generate preliminary FF&E budgets by project type and square footage.
Furniture Spec Writer
Write specification-grade furniture product descriptions.
Space Programming Calculator
Calculate square footage needs and furniture configurations by space type.
Product Comparison Matrix Generator
Generate professional product comparison matrices for client presentations.
Furniture Finder from Photo
Upload a photo of furniture to identify the style, manufacturer, and find comparable products.
General Contracting
AI Bid Proposal Writer
Generate professional GC bid proposals in seconds.
Subcontractor Scope Letter Writer
Write airtight sub scope letters that prevent scope gaps.
RFI Generator
Draft clear, professional RFIs that get answered fast.
Spec Section Summarizer
Summarize any spec section into actionable bullet points.
Punch List Generator
Generate trade-by-trade punch list checklists for walkthroughs.
AI Daily Field Report
Upload a job site photo and generate a professional daily field report.
Glazing
AI Bid Proposal Writer
Generate professional glazing bid proposals in seconds.
Glass Specification Builder
Build a complete glass specification for any application.
Energy Code Compliance Checker
Check if your glazing meets energy code requirements.
Window & Door Schedule Generator
Generate formatted window and door schedules instantly.
Wind Load & Glass Thickness Calculator
Calculate wind loads and minimum glass thickness per ASCE 7.
Glass Failure Forensics
Upload a photo of broken glass to identify the failure mode.
Landscaping
AI Bid Proposal Writer
Generate professional landscaping bid proposals in seconds.
Plant Palette Generator
Get a custom plant palette tailored to your site conditions.
Soil & Material Volume Calculator
Calculate cubic yards, tons, and truckloads for any material.
Irrigation Coverage Planner
Design irrigation zones with head counts and GPM calculations.
Landscape Maintenance Plan Generator
Create month-by-month landscape maintenance calendars.
AI Yard Transformer
Upload a photo of your yard and preview landscaping services.
Mechanical
AI Bid Proposal Writer
Generate professional HVAC bid proposals in seconds.
Quick Load Calculator
Get rough HVAC load estimates for budgeting and bidding.
Duct Size Calculator
Calculate duct dimensions for any CFM and application.
Mechanical Code Q&A
Get instant answers to IMC and ASHRAE code questions.
Submittal Review Checklist Generator
Generate comprehensive HVAC submittal review checklists.
Energy Bill Analyzer
Upload a utility bill photo and get savings recommendations.
Other Trades
AI Construction Bid Proposal Writer
Generate professional bid proposals for any construction trade.
Safety Toolbox Talk Generator
Generate OSHA-compliant safety toolbox talks for any trade.
Lien Waiver Generator
Generate state-specific lien waivers for any payment type.
Construction Contract Clause Explainer
Get plain-language explanations of construction contract clauses.
Lien Deadline Calculator
Calculate state-specific mechanics lien deadlines.
Painting
AI Bid Proposal Writer
Generate professional painting bid proposals in seconds.
Paint Coverage & Material Calculator
Calculate exactly how much paint and supplies you need.
Painting Spec Interpreter
Translate complex painting specifications into plain language.
Surface Prep Advisor
Get expert advice on how to prepare any surface for painting.
Coating System Selector
Get the right primer + paint system for any substrate and environment.
Surface Doctor
Upload a photo of a paint problem and get a diagnosis with treatment plan.
Plumbing
AI Bid Proposal Writer
Generate professional plumbing bid proposals in seconds.
Plumbing Code Q&A
Get instant answers to IPC and UPC plumbing code questions.
Fixture Unit & Pipe Sizing Calculator
Calculate fixture units and pipe sizes for any plumbing system.
Water Heater Sizing Tool
Size water heaters based on fixtures, occupancy, and demand.
Pipe Material Selector
Get pipe material recommendations for any plumbing application.
Plumbing Rough-In Inspector
Upload a photo of rough-in work and check for code violations.
Need the full power of AI for your takeoffs?
These free tools are just a taste. Exayard's full platform does AI-powered takeoffs, estimates, and material lists from your construction plans.