AI construction estimating

AI takeoff software

Let the AI do the tracing. Exayard, an AI takeoff and estimating platform for contractors, reads your plans and turns them into a priced, trade-ready estimate in minutes. The takeoff that used to eat your evening now takes a coffee break.

What is AI takeoff software?

AI takeoff software reads your construction drawings and measures the quantities for you: it counts the symbols, totals the linear feet, and adds up the square footage, without you clicking each item by hand. A takeoff is the measurement step of estimating, and AI automates it.

Traditional takeoff tools still make you trace every line and click every fixture on screen. AI takeoff does the detection itself, then hands you the quantities to review. You go from hours of manual measuring to a few minutes of review and approve.

What the AI measures

Counts.

Receptacles, doors, windows, fixtures, sprinkler heads, any countable symbol on the page.

Lengths.

Linear feet of wall, pipe, conduit, baseboard, fence, framing.

Areas.

Square footage of slab, flooring, drywall, roofing, paint.

Volumes.

Cubic yards of concrete and earthwork, derived from area and depth.

Everything is laid out for review on the plan, so you can confirm or correct each quantity before it counts.

How automated takeoff works

1

Upload the plans.

A PDF plan set or a single sheet. PDF, images, and CAD files (DWG, DXF, DGN) all work, with no special export.

2

AI does the takeoff.

Exayard detects and measures every element across the sheets and presents the quantities on the drawing for review.

3

Send it to the estimate.

Approved quantities flow straight into a priced line-item estimate. See AI estimating software for the pricing step.

AI takeoff vs manual takeoff

Manual takeoffAI takeoff (Exayard)
Who countsYou, item by itemThe AI, all sheets at once
Time per plan setHours to daysMinutes
ConsistencyDrops as you tireSame across every sheet
Your jobTrace everythingReview and approve
File neededOn-screen tracing toolYour existing PDF plans

Works on the plans you already have

Exayard reads standard PDF blueprints, the same plan sets you get from architects and general contractors. It also takes image files and CAD files (DWG, DXF, DGN), with no setup or conversion step. Upload the drawings as they are and the AI handles the rest.

Takeoff for every trade

The AI is tuned to what each trade measures. Explore by trade: concrete, electrical, roofing, framing and carpentry, plumbing, drywall. All trades are on the homepage.

Frequently asked questions

Run an AI takeoff on your own plans

Upload a plan set and watch Exayard count and measure it in minutes.