Built for General Contractors

Verify sub bids, catch scope gaps, and build accurate budgets. AI-powered takeoffs give you independent quantity data across every trade on your project.

Multi-trade oversight from a single platform

Run takeoffs across all trades on one project. Compare quantities against sub bids, identify scope gaps between trades, and quantify change orders quickly.

Sub bid verification

Run independent takeoffs to verify subcontractor quantities. Know whether a low bid reflects efficiency or missing scope before you award the contract.

Scope gap detection

Compare takeoffs across adjacent trades to identify items that fall between scopes. Catch the gaps before they become change orders during construction.

Multi-trade project takeoffs

Run quantity takeoffs for every trade division on a single project from one platform. No need to manage separate tools for different specialties.

Change order quantification

When design changes hit, quantify the impact in minutes. Upload revised plans and compare against original takeoffs to see exactly what changed and by how much.

Why independent quantity verification matters for general contractors

General contractors manage risk across every trade on a project, but most rely entirely on subcontractor-provided quantities during preconstruction. When a sub bid comes in low, the GC has limited ability to determine whether the savings are real or the result of missing scope. When adjacent trades disagree on where one scope ends and another begins, the gaps often go unnoticed until construction reveals them as change orders. These issues compound on larger projects where dozens of subcontractors submit bids with varying levels of takeoff quality.

AI-powered takeoffs give general contractors the ability to run independent quantity verification across every trade on a project. Instead of accepting subcontractor numbers at face value, preconstruction teams can compare their own quantities against each bid. This does not replace the subcontractor estimating process. It adds a verification layer that catches scope gaps, quantity discrepancies, and pricing anomalies before they become project cost problems. On a typical commercial project, GCs using this approach report identifying 5-15% in potential cost issues during preconstruction that would have surfaced as change orders during construction.

Build budgets you can defend

General contractors using Exayard report fewer budget surprises, better sub negotiations, and more confident project pricing.

Catch scope gaps before they cost you

Identify items that fall between trade scopes before construction starts. Resolve ambiguities during preconstruction instead of paying for them as change orders.

Negotiate sub bids with data

Walk into scope reviews with independent quantities. Understand where a subcontractor bid is high, where it is low, and where scope might be missing.

Reduce budget overruns by 40%

Independent quantity verification across all trades catches the discrepancies that typically surface during construction as costly surprises.

Quantify change orders in minutes

When the owner issues a design change, quantify the impact immediately. Faster change order turnaround means faster approval and less project delay.

Win more competitive bids

Accurate self-performed work estimates and verified sub numbers let you price projects tighter without increasing risk.

Standardize your preconstruction process

Give your preconstruction team a consistent workflow for quantity verification across all project types and sizes.

Frequently asked questions

Common questions from general contractors evaluating Exayard for preconstruction and project oversight.

Build your next project on better data

Join general contractors who use Exayard for independent quantity verification, scope gap detection, and confident project budgets.