Construction takeoff & estimating

Construction takeoff & estimating CLI for OpenCode

Automate construction takeoffs and estimates from your terminal. Built for OpenCode to measure plans, price materials, and draft bids with whichever LLM you already use.

What is OpenCode?

OpenCode is an open-source AI coding agent by Anomaly that runs in your terminal with a rich TUI and works with 75+ LLMs. Add the Exayard MCP server to opencode.json and it can do estimating work too: running takeoffs, pricing materials, and drafting bids without leaving the command line.

Built for autonomous estimating

Exayard exposes every takeoff, pricing, and bid action as a tool OpenCode can call, so it does the work you would normally click through by hand.

Estimate in plain English

Describe the outcome and OpenCode drives Exayard for you — no clicking through screens, no glue code.

Real catalog and vendor pricing

OpenCode searches your product catalog and live vendor prices, so every estimate is built on real numbers.

Takeoff to bid in one request

Chain detection, approval, estimating, and bid generation into a single turn instead of an afternoon of work.

What you can do with OpenCode

Once OpenCode is connected, you can drive Exayard with plain-language prompts.

Browse projects, files, and pages
Run AI takeoffs on your plans
Search the product catalog and vendor prices
Generate cost estimates and bid documents
Subscribe to project lifecycle webhooks
Answer questions grounded in uploaded plans

Install in 60 seconds

Four short steps to wire OpenCode to your Exayard projects.

One-step setup

Fastest path: paste this into OpenCode and it connects Exayard itself.

Fetch https://exayard.com/prompt.md
1

Add the Exayard MCP server

Merge the snippet below into opencode.json in your project root, or into ~/.config/opencode/opencode.json for global setup.

{
  "$schema": "https://opencode.ai/config.json",
  "mcp": {
    "exayard": {
      "type": "remote",
      "url": "https://api.exayard.com/mcp",
      "enabled": true
    }
  }
}
2

Authorize Exayard

Run the command below and finish the OAuth sign-in in your browser. No API keys to paste.

opencode mcp auth exayard
3

Confirm the tools

List your configured MCP servers to confirm Exayard is connected, then try one of the example prompts below.

opencode mcp list
4

Try a prompt

Ask OpenCode to do real estimating work. It calls the right Exayard tools and pauses for your approval on anything destructive.

Example prompts

Drop any of these into OpenCode after connecting.

You

Create a project named "Maple Heights renovation" and upload my plan PDFs.

You

Run a takeoff on page 3 of the Smith Residence plans and show me the proposed receptacle count.

You

Generate a bid from the approved Smith Residence takeoff, with a 15% markup.

You

Search the product catalog for 12-gauge copper wire and show me the cheapest vendor.

You

Compare estimated cost vs. last quarter for projects tagged "kitchen remodel".

Built-in workflows

Exayard ships MCP slash-commands so OpenCode can run end-to-end workflows in a single turn.

/takeoff_from_plans

Run a takeoff end-to-end on uploaded plans.

/generate_bid_from_takeoff

Price an approved takeoff and emit a bid document.

/review_estimate_line_items

Audit an existing estimate for outliers and missing prices.

/create_project_from_upload

Scaffold a project and attach files from a chat upload.

Browse the full tool catalog

Keep a human in the loop

Destructive tools (archive, remove, cancel, approve) are gated behind a propose_destructive_action step that surfaces in OpenCode and waits for your explicit confirmation before running.

Long-running calls like create_estimate and create_bid take 30–60 seconds — OpenCode will warn you before invoking them.

Frequently asked questions

Works with your whole agent stack

Exayard speaks MCP, so it drops into every major AI agent and editor.

Ready to win more bids?

Use Exayard to estimate faster and win more work. Get started today.